# Forecast ledger

Every New Runtime analysis and weekly metadox makes dated, probability-weighted forecasts. Each one is graded when it comes due.

## Scorecard

- Forecasts: 352 (open 352, confirmed 0, refuted 0, unclear 0)
- Resolved: 0
- First resolutions due: 2026-12-27
- Hit rate (confirmed / confirmed + refuted): n/a
- Brier score (lower is better): n/a

## Calibration

No graded forecasts yet.

## Open - coming due

- **Enterprises will begin allocating dedicated AI cost‑center budgets separate from traditional SaaS spend, driven by the need to track per‑run AI consumption.** - 70%, 3-month horizon, due 2026-12-27. Signpost: Public statements from CFOs of three large enterprises (e.g., SAP, Siemens, Unilever) describing new AI‑budget line items in Q3 financial disclosures. Source: [Microsoft’s Copilot Home reshapes the enterprise AI platform landscape](https://newruntime.com/analysis/microsoft-s-copilot-home-reshapes-the-enterprise-ai-platform-landscape/)
- **Within 3 months, the most credible replications will emphasize loss curves, generator cost, and transfer tests rather than broad claims about replacing pretraining corpora.** - 70%, 3-month horizon, due 2026-12-27. Signpost: Replication reports publish training-compute accounting and external benchmark results alongside self-play improvements. Source: [Zero-data self-play could move pretraining spend from corpora to curriculum search](https://newruntime.com/analysis/zero-data-self-play-could-move-pretraining-spend-from-corpora-to-curriculum/)
- **OpenAI will publish a technical blog post describing a hardened DNS isolation strategy within the next three months.** - 75%, 3-month horizon, due 2026-12-27. Signpost: A blog entry on the OpenAI Alignment site outlining resolver routing changes or the use of a private DNS server for sandboxed agents. Source: [OpenAI’s DNS Exfiltration Incident Shows Why DNS‑Only Filtering Fails for Autonomous Agents](https://newruntime.com/analysis/openai-s-dns-exfiltration-incident-shows-why-dns-only-filtering-fails-for/)
- **Independent benchmarks (e.g., MLPerf or LLM-Bench) will confirm a 20-30% latency improvement for Sonnet 5.5 on document-generation tasks within the next quarter.** - 80%, 3-month horizon, due 2026-12-29. Signpost: Release of third-party benchmark results comparing Sonnet 5.5’s latency and token efficiency against Sonnet 5 and competitors. Source: [Anthropic’s Sonnet 5.5: 30% faster, 30% cheaper—but only for tightly scoped tasks](https://newruntime.com/analysis/anthropic-s-sonnet-5-5-30-faster-30-cheaper-but-only-for-tightly-scoped-tasks/)
- **Within three months Meta will publish a help‑center article that lists which third‑party connectors are generally available for Muse Small Business and explains the UI flow for approving external actions.** - 65%, 3-month horizon, due 2026-12-30. Signpost: A new Meta support page or product update that enumerates GA connectors and shows screenshots of the approval prompt. Source: [Muse’s real test is whether small businesses trust it with the next click](https://newruntime.com/analysis/muse-s-real-test-is-whether-small-businesses-trust-it-with-the-next-click/)
- **We expect OpenAI’s public dots materials to clarify supported integrations or availability before the broad connector claims become dependable planning assumptions.** - 65%, 3-month horizon, due 2026-12-30. Signpost: An official page or release note listing supported integrations or concrete availability details. Source: [Dots makes permission design part of the agent, not an afterthought](https://newruntime.com/analysis/dots-makes-permission-design-part-of-the-agent-not-an-afterthought/)
- **A GitHub repository providing a long‑context prompt manager for Sol will reach 3,000 stars within three months** - 60%, 3-month horizon, due 2026-12-30. Signpost: GitHub trending lists for `gpt-6.1-sol` or `long-context-agent` tag a new project crossing the 3k‑star threshold. Source: [Long‑context coding agents will reshape how we build AI‑driven development pipelines](https://newruntime.com/analysis/long-context-coding-agents-will-reshape-how-we-build-ai-driven-development/)
- **Google will identify an access route for developers or enterprises beyond the initial trusted-defender cohort, while access remains staged.** - 60%, 3-month horizon, due 2027-01-01. Signpost: Google’s announcement or API documentation names a new eligible group or preview route. Source: [Argon’s million-token ceiling still needs a coding test](https://newruntime.com/analysis/argon-s-million-token-ceiling-still-needs-a-coding-test/)
- **LangChain will document at least one concrete HTTP-channel deployment pattern that explains request verification and caller identity handling.** - 65%, 3-month horizon, due 2027-01-01. Signpost: Official documentation or a customer example walks through a deployed HTTP channel and states how requests are verified and users identified. Source: [HTTP channels make agents easier to wire in—and harder to trust blindly](https://newruntime.com/analysis/http-channels-make-agents-easier-to-wire-in-and-harder-to-trust-blindly/)
- **Google will publish a specific observation or design consequence from the prototype’s in-orbit work, rather than only restating that the satellite is operating.** - 60%, 3-month horizon, due 2027-01-02. Signpost: A public update reports a measured environmental effect, test outcome or hardware design change. Source: [Suncatcher’s first satellite tests chips, not an orbital data center](https://newruntime.com/analysis/suncatcher-s-first-satellite-tests-chips-not-an-orbital-data-center/)
- **Modal’s public Sidecar documentation will clarify at least one operational detail about egress coverage or proxy configuration as beta use develops.** - 65%, 3-month horizon, due 2027-01-02. Signpost: A documentation update explains supported traffic types, enforcement configuration, or bypass behavior. Source: [A nearby proxy is useful only if agents cannot route around it](https://newruntime.com/analysis/a-nearby-proxy-is-useful-only-if-agents-cannot-route-around-it/)
- **Northstar will continue to record concrete compatibility fixes in its changelog rather than treating the current results as a finished milestone.** - 65%, 3-month horizon, due 2027-01-05. Signpost: A dated changelog entry describes a browser behavior fix tied to a reproducible web-platform issue. Source: [Northstar’s DOM strength runs ahead of its CSS readiness](https://newruntime.com/analysis/northstar-s-dom-strength-runs-ahead-of-its-css-readiness/)
- **Unbiased will publish a stable-release notice or a subsequent Pareto update that clarifies whether the preview is complete.** - 70%, 3-month horizon, due 2027-01-06. Signpost: A dated Unbiased release note or changelog entry marks 26.10 stable or specifies its successor. Source: [Pareto’s lower rates are a test of cost per successful task, not a cheaper bill by default](https://newruntime.com/analysis/pareto-s-lower-rates-are-a-test-of-cost-per-successful-task-not-a-cheaper-bill/)
- **An independent evaluation will report EmbeddingGemma 2 retrieval quality together with latency and memory on a specified device and workload.** - 65%, 3-month horizon, due 2027-01-07. Signpost: A public report identifies hardware, corpus, paired-query setup, retrieval metric, latency and memory. Source: [EmbeddingGemma 2 makes modularity the real edge advantage](https://newruntime.com/analysis/embeddinggemma-2-makes-modularity-the-real-edge-advantage/)
- **Mistral will make Large 4 weights publicly available by its stated end-of-October target.** - 70%, 3-month horizon, due 2027-01-07. Signpost: A public weights download appears, accompanied by license terms or deployment instructions. Source: [Large 4’s sovereignty case depends on weights, not the preview](https://newruntime.com/analysis/large-4-s-sovereignty-case-depends-on-weights-not-the-preview/)
- **OpenAI will publish a dated availability update for web extensions for Free and Go users.** - 60%, 3-month horizon, due 2027-01-08. Signpost: An official dated release note or documentation update specifies availability for those plans. Source: [A plugin surface is not a distribution channel](https://newruntime.com/analysis/a-plugin-surface-is-not-a-distribution-channel/)
- **Anthropic’s public beta materials will continue to describe the two workflows—editing from the Workspace add-on and editing through connectors—rather than establish which one users prefer.** - 65%, 3-month horizon, due 2027-01-08. Signpost: A product update or help page continues to document both routes but reports no comparative usage or preference data. Source: [Claude’s real test is whether edits beat copy-and-paste](https://newruntime.com/analysis/claude-s-real-test-is-whether-edits-beat-copy-and-paste/)
- **GitHub will clarify the availability status of local sandboxing in its changelog or documentation.** - 65%, 3-month horizon, due 2027-01-08. Signpost: A GitHub changelog or documentation page explicitly changes the public-preview status or states a newer availability state for local sandboxing. Source: [Treat Copilot sandboxing as a preview until GitHub says otherwise](https://newruntime.com/analysis/treat-copilot-sandboxing-as-a-preview-until-github-says-otherwise/)
- **OpenBPM’s public migration material or release notes will clarify at least one concrete upgrade check for Spring dependencies or scripts.** - 65%, 3-month horizon, due 2027-01-09. Signpost: A guide revision or release note specifies a migration step or known issue for dependencies or Nashorn-based scripts. Source: [OpenBPM 2.0’s compatibility promise needs a narrower test](https://newruntime.com/analysis/openbpm-2-0-s-compatibility-promise-needs-a-narrower-test/)
- **Google will publish clearer customer-facing availability or access conditions for Gemini Agent or its persistent runtime.** - 70%, 3-month horizon, due 2027-01-10. Signpost: A Google Cloud product or documentation update identifies eligible customers, regions, or a general-availability status. Source: [Google is selling the work harness, not a winning model](https://newruntime.com/analysis/google-is-selling-the-work-harness-not-a-winning-model/)
- **Yandex will publish a status update that clarifies restoration or resource-creation limits for at least one affected facility or cloud zone.** - 70%, 3-month horizon, due 2027-01-10. Signpost: A public Yandex or Yandex Cloud notice gives a facility or zone status, restoration milestone, or provisioning constraint. Source: [Yandex’s recovery may be limited by capacity, not just damaged equipment](https://newruntime.com/analysis/yandex-s-recovery-may-be-limited-by-capacity-not-just-damaged-equipment/)
- **OpenAI will publicly address the letter or clarify evaluator access or external-collaboration procedures.** - 55%, 3-month horizon, due 2027-01-10. Signpost: A public response, policy update, or oversight-body statement that specifies access scope or collaboration procedures. Source: [Safety scrutiny depends on what outside evaluators can actually see](https://newruntime.com/analysis/safety-scrutiny-depends-on-what-outside-evaluators-can-actually-see/)
- **OpenAI will publish further documentation clarifying Ultrafast access or operating terms.** - 55%, 3-month horizon, due 2027-01-11. Signpost: An official product or documentation update specifies additional eligibility, capacity, or usage details. Source: [Ultrafast sells faster turns, not proven faster workflows](https://newruntime.com/analysis/ultrafast-sells-faster-turns-not-proven-faster-workflows/)
- **Public developer tests will start reporting Muse Wonder outcomes on resumable tasks, not just demonstrations of its announced features.** - 65%, 3-month horizon, due 2027-01-13. Signpost: By January 12, 2027, a published evaluation reports task criteria, cross-session behavior, and completion or recovery failures. Source: [Test what an agent keeps before trusting what it can finish](https://newruntime.com/analysis/test-what-an-agent-keeps-before-trusting-what-it-can-finish/)
- **The live meter and reset will lead some teams to manage first-party Grok use across chat and coding as a shared weekly budget rather than as independent product usage.** - 65%, 3-month horizon, due 2027-01-13. Signpost: Account guidance or customer reports describe users monitoring the shared meter and shifting Grok tasks between chat and Cursor during a week. Source: [A weekly Grok pool makes model routing a team budget decision](https://newruntime.com/analysis/a-weekly-grok-pool-makes-model-routing-a-team-budget-decision/)
- **The court-supervised process will produce a public milestone before Character.ai’s stated late-November or early-December 2026 target, such as a qualified proposal or a revised timeline.** - 75%, 3-month horizon, due 2027-01-14. Signpost: A court filing or company announcement identifies sale progress, a proposal, or a delay. Source: [One unusable offer from 28 contacts puts Character.ai’s sale on the clock](https://newruntime.com/analysis/one-unusable-offer-from-28-contacts-puts-character-ai-s-sale-on-the-clock/)
- **Google will document at least some specific connected-app actions or task limits for Gemini users.** - 65%, 3-month horizon, due 2027-01-14. Signpost: A Gemini help page, release note, or product update names eligible actions, limits, or confirmation requirements for one or more connected apps. Source: [Argon’s global rollout outruns the evidence on what it can safely do](https://newruntime.com/analysis/argon-s-global-rollout-outruns-the-evidence-on-what-it-can-safely-do/)
- **Official pricing information will continue to specify the relationship between shared-pool usage and excluded third-party Cursor models.** - 65%, 3-month horizon, due 2027-01-15. Signpost: The official pricing or usage documentation explicitly lists eligible models and how third-party Cursor models are charged. Source: [A shared weekly pool turns Cursor and Grok into a trade-off](https://newruntime.com/analysis/a-shared-weekly-pool-turns-cursor-and-grok-into-a-trade-off/)
- **Cursor’s Muse Wonder listing will remain separately metered unless its published plan or provider terms change.** - 65%, 3-month horizon, due 2027-01-16. Signpost: Cursor’s model documentation still states that usage is excluded from plan allowances and lists token rates. Source: [Muse Wonder’s real test is cost per accepted change](https://newruntime.com/analysis/muse-wonder-s-real-test-is-cost-per-accepted-change/)
- **Some teams testing Token Pass will compare their realized credit use with the subscription fee before deciding whether to renew.** - 70%, 3-month horizon, due 2027-01-16. Signpost: User reports or Vercel product material describe credit utilization or renewal decisions. Source: [Token Pass only saves money if teams use its narrow model allowance](https://newruntime.com/analysis/token-pass-only-saves-money-if-teams-use-its-narrow-model-allowance/)
- **A public evaluation or detailed practitioner report will compare Muse Spark Open on a coding task and disclose at least one operational measure, rather than report availability alone.** - 60%, 3-month horizon, due 2027-01-17. Signpost: A published report identifies a concrete coding task and gives its outcome plus latency, reliability, or cost. Source: [Muse Spark Open is now testable inside a real coding workflow](https://newruntime.com/analysis/muse-spark-open-is-now-testable-inside-a-real-coding-workflow/)
- **At least one inference project or maintainer will publish or maintain a reproducible Ling-3.1-flash deployment recipe with explicit hardware and performance details.** - 65%, 3-month horizon, due 2027-01-18. Signpost: A versioned SGLang or vLLM guide reports a working configuration and measured latency or throughput on named hardware. Source: [Ling’s 25B-active label does not make it a small model to serve](https://newruntime.com/analysis/ling-s-25b-active-label-does-not-make-it-a-small-model-to-serve/)
- **Independent evaluations will publish task-level Glimmer results beyond the two-Python-task reproduction cited in the dossier.** - 70%, 3-month horizon, due 2027-01-20. Signpost: A public report specifies tasks, hardware, tool setup, and results that can be compared with other models. Source: [Muse Glimmer’s benchmark lead is still a claim to test](https://newruntime.com/analysis/muse-glimmer-s-benchmark-lead-is-still-a-claim-to-test/)
- **An independent agentic-coding evaluation reports M3.1 Flash more than 5 points below MiniMax's self-reported 73.7% on DeepSWE v1.1 or its nearest equivalent.** - 45%, 3-month horizon, due 2027-01-20. Signpost: A third-party leaderboard such as Artificial Analysis, SWE-bench or Terminal-Bench publishes an M3.1 Flash run along with its harness configuration. Source: [MiniMax is pricing M3.1 Flash to become the default cheap model in coding agents, but its "25x cheaper" claim needs a stated comparison](https://newruntime.com/analysis/minimax-is-pricing-m3-1-flash-to-become-the-default-cheap-model-in-coding/)
- **At least one major coding-agent tool features M3.1 Flash as a default or recommended low-cost model.** - 45%, 3-month horizon, due 2027-01-20. Signpost: M3.1 Flash appears as a default or recommended model in release notes or model settings for Cline, Kilo or Cursor. Source: [MiniMax is pricing M3.1 Flash to become the default cheap model in coding agents, but its "25x cheaper" claim needs a stated comparison](https://newruntime.com/analysis/minimax-is-pricing-m3-1-flash-to-become-the-default-cheap-model-in-coding/)
- **At least one independent public evaluation will compare LFM2.5-24B-A2B with a named baseline on an agentic task and specify the model variant and test conditions.** - 65%, 3-month horizon, due 2027-01-20. Signpost: A public report names the LFM2.5 variant, baseline, task, runtime and hardware, and gives comparable results. Source: [Local GGUF tests cannot verify Liquid AI’s agent benchmark claim](https://newruntime.com/analysis/local-gguf-tests-cannot-verify-liquid-ai-s-agent-benchmark-claim/)
- **By 2027-01-21, Factory will publish quantitative completion, merge or failure rates specifically for Linear-delegated issues.** - 15%, 3-month horizon, due 2027-01-21. Signpost: A Factory blog post, docs page or changelog entry with a percentage for delegated Linear issues. Rationale: the current docs contain no outcome metrics, and agent vendors rarely release per-integration success data within a quarter of launch. Source: [Factory's Linear delegation lets anyone who can file an issue borrow the org's Git credentials](https://newruntime.com/analysis/factory-s-linear-delegation-lets-anyone-who-can-file-an-issue-borrow-the-org-s/)
- **Python packaging guidance will continue to direct users toward explicit package-version updates for this incident rather than relying solely on browser or OS remediation.** - 70%, 3-month horizon, due 2027-01-21. Signpost: A maintainer update or release note reiterating affected Python package versions or trust-bundle handling. Source: [A browser block cannot update the certificate bundle inside your app](https://newruntime.com/analysis/a-browser-block-cannot-update-the-certificate-bundle-inside-your-app/)
- **CISA adds at least one of CVE-2026-109618 or CVE-2026-109619 to its Known Exploited Vulnerabilities catalog.** - 75%, 3-month horizon, due 2027-01-22. Signpost: A KEV entry naming either CVE with a remediation due date. Source: [The php2shell fix is a version number, and the tools people will use to check for it can't see it](https://newruntime.com/analysis/the-php2shell-fix-is-a-version-number-and-the-tools-people-will-use-to-check/)
- **A security vendor publishes a report attributing a mass-compromise campaign against WordPress, Drupal or Magento sites to php2shell, including hosts reached by bypassing a CDN or WAF.** - 45%, 3-month horizon, due 2027-01-22. Signpost: An incident write-up from a firm such as Huntress, Wiz or Cloudflare with host counts tied to these CVEs and mention of direct-to-origin or WAF-evading requests. Source: [The php2shell fix is a version number, and the tools people will use to check for it can't see it](https://newruntime.com/analysis/the-php2shell-fix-is-a-version-number-and-the-tools-people-will-use-to-check/)
- **Within three months, PHP or hosting providers will publish a measurable update on affected-runtime patch uptake or remaining exposure, rather than only repeating upgrade guidance.** - 55%, 3-month horizon, due 2027-01-22. Signpost: A public advisory or provider update gives a count, proportion, or version breakdown of patched versus still-exposed PHP deployments. Source: [PHP’s leaked disclosure turned patch readiness into the real security test](https://newruntime.com/analysis/php-s-leaked-disclosure-turned-patch-readiness-into-the-real-security-test/)
- **At least one hosted inference provider will list Flint with per-token pricing, despite its 'local' positioning.** - 60%, 3-month horizon, due 2027-01-22. Signpost: Flint appearing under Inference Providers on its Hugging Face page or in a provider's model catalogue. Source: [Flint's speed claims hold only for one runtime at short context, and nobody has measured it on a laptop at long context](https://newruntime.com/analysis/flint-s-speed-claims-hold-only-for-one-runtime-at-short-context-and-nobody-has/)
- **At least one public evaluation will report Flint coding-task outcomes alongside explicit hardware and runtime conditions.** - 60%, 3-month horizon, due 2027-01-23. Signpost: A reproducible report or benchmark repository publishes Flint results with task prompts, hardware and runtime identified. Source: [Flint has to prove it works beyond its showcase setup](https://newruntime.com/analysis/flint-has-to-prove-it-works-beyond-its-showcase-setup/)
- **Mistral publishes the Timestral tech report with per-dataset or per-configuration GIFT-Eval tables.** - 55%, 3-month horizon, due 2027-01-23. Signpost: The 'coming soon' tech-report link on the Hugging Face model card resolves to a document with per-dataset tables. Reasoning: the link is already promised publicly, but labs often slip report dates, so this is only slightly better than a coin flip. Source: [IBM's own numbers show four forecasters averaged together buy almost nothing, and Timestral's lead still needs a matched harness](https://newruntime.com/analysis/ibm-s-own-numbers-show-four-forecasters-averaged-together-buy-almost-nothing/)
- **OpenAI models become generally available in Google Cloud Model Garden with a published list of named models.** - 70%, 3-month horizon, due 2027-01-23. Signpost: A Google Cloud or OpenAI GA notice listing specific models and supported regions. Source: [If OpenAI is following Microsoft's enterprise path, its security story will live in contracts rather than on patch days](https://newruntime.com/analysis/if-openai-is-following-microsoft-s-enterprise-path-its-security-story-will-live/)
- **A public user report will document a practical archive-access or data-handling constraint when using the precomputed embeddings.** - 55%, 3-month horizon, due 2027-01-23. Signpost: A user issue, tutorial or technical post describes a concrete download, storage, tiling or processing bottleneck. Source: [OlmoEarth’s cost advantage is reusable inference, not cheap pretraining](https://newruntime.com/analysis/olmoearth-s-cost-advantage-is-reusable-inference-not-cheap-pretraining/)
- **At least one third-party evaluator publishes a per-task cost comparison of Sonnet 5.5 vs Sonnet 5 on an agentic or coding benchmark, showing Sonnet 5.5 at equal or higher cost per task in at least one effort setting.** - 50%, 3-month horizon, due 2027-01-24. Signpost: A public leaderboard or benchmark write-up that reports dollars per task for both models and shows Sonnet 5.5 at parity or more expensive in at least one configuration. Source: [Sonnet 5.5's 30% discount is Anthropic's per-token claim; your job now is proving it per task through a policy layer](https://newruntime.com/analysis/sonnet-5-5-s-30-discount-is-anthropic-s-per-token-claim-your-job-now-is-proving/)
- **CVE-2026-110264 is added to CISA's Known Exploited Vulnerabilities catalog.** - 35%, 3-month horizon, due 2027-01-25. Signpost: A CISA KEV entry, or GitLab updating its advisory to report exploitation in the wild. Source: [A human bounty hunter found GitLab's 12-year-old CVSS 10.0 bug, and the new AI repo scanners don't look at the platform layer where it lived](https://newruntime.com/analysis/a-human-bounty-hunter-found-gitlab-s-12-year-old-cvss-10-0-bug-and-the-new-ai/)
- **A working public proof-of-concept for CVE-2026-110264 is published.** - 50%, 3-month horizon, due 2027-01-25. Signpost: A patch-diff write-up or PoC repository citing the CVE ID, followed by reports of mass scanning. Source: [A human bounty hunter found GitLab's 12-year-old CVSS 10.0 bug, and the new AI repo scanners don't look at the platform layer where it lived](https://newruntime.com/analysis/a-human-bounty-hunter-found-gitlab-s-12-year-old-cvss-10-0-bug-and-the-new-ai/)
- **NVIDIA publishes the pending llama.cpp recipe on the Bolt E4B model card.** - 65%, 3-month horizon, due 2027-01-25. Signpost: The Hugging Face card's 'recipe pending' note is replaced by a linked recipe or documentation page. Source: [The "4GB" in Nemotron 3.5 Bolt E4B is a memory target, not what you will download or run](https://newruntime.com/analysis/the-4gb-in-nemotron-3-5-bolt-e4b-is-a-memory-target-not-what-you-will-download/)
- **OpenCode will publicly disclose either the number of exposed keys or whether any were misused.** - 40%, 3-month horizon, due 2027-01-25. Signpost: A post-incident report or updated statement from OpenCode giving key counts, misuse findings or a root cause. Source: [Hiding provider keys behind a gateway only moves the pile; short-lived, scoped keys are what limit a breach](https://newruntime.com/analysis/hiding-provider-keys-behind-a-gateway-only-moves-the-pile-short-lived-scoped/)
- **An independent multi-turn tool-use evaluation lists Bolt E4B and Gemma 4 E4B-it on the same harness and shows Bolt ahead by a small margin rather than a large one.** - 45%, 3-month horizon, due 2027-01-25. Signpost: A third-party leaderboard or write-up reporting both models at comparable quantization with per-task scores. Source: [NVIDIA tuned Bolt E4B to answer fast in 4 GB, not to beat Gemma on raw capability](https://newruntime.com/analysis/nvidia-tuned-bolt-e4b-to-answer-fast-in-4-gb-not-to-beat-gemma-on-raw-capability/)
- **OpenAI publishes written approval criteria or an application page for model-access intermediaries. Rationale for 0.4: operators need guidance before the effective date, but OpenAI often handles partner programs privately, so this is slightly less likely than not.** - 40%, 3-month horizon, due 2027-01-25. Signpost: An OpenAI help-center or policy page that sets out intermediary review requirements or an application process. Source: [OpenAI's approval rule for gateways makes the model router the riskiest part of your stack, so keep your ability to switch models in MCP and skills](https://newruntime.com/analysis/openai-s-approval-rule-for-gateways-makes-the-model-router-the-riskiest-part-of/)
- **Moonshot will publish a public notice that either provides K3.1 Pro weights with an identifiable license or revises the announced release status.** - 65%, 3-month horizon, due 2027-01-25. Signpost: An official release page or model repository states availability and licensing, or gives a changed schedule. Source: [Kimi’s post-training pipeline is the claim worth testing](https://newruntime.com/analysis/kimi-s-post-training-pipeline-is-the-claim-worth-testing/)
- **Moonshot will publish K3.1 Pro weights or clarify their release status and licensing by its stated target date.** - 65%, 3-month horizon, due 2027-01-25. Signpost: A public download or official update specifies availability and license terms by November 4, 2026. Source: [Kimi K3.1 Pro is already useful, but open weights remain the real test](https://newruntime.com/analysis/kimi-k3-1-pro-is-already-useful-but-open-weights-remain-the-real-test/)
- **At least one third-party inference provider serves FLUX 3 Image Klein commercially.** - 50%, 3-month horizon, due 2027-01-26. Signpost: The Klein model card's deploy panel lists an active inference provider, or a provider model page lists flux-3-image-klein with its own price. Source: [BFL's hosted price is about a cent per image; licence terms and LoRA export will decide the economics](https://newruntime.com/analysis/bfl-s-hosted-price-is-about-a-cent-per-image-licence-terms-and-lora-export-will/)
- **An independent third party (not StepFun, Vercel or OpenRouter) publishes agentic-coding results for step-5-preview on a public leaderboard or eval report.** - 60%, 3-month horizon, due 2027-01-26. Signpost: Step 5 Preview appears on a widely cited coding-agent leaderboard or in an independent eval write-up. Source: [Step 5 Preview plugs into Claude Code, but nothing published yet shows it is a drop-in swap](https://newruntime.com/analysis/step-5-preview-plugs-into-claude-code-but-nothing-published-yet-shows-it-is-a/)
- **Kimi will publish a notice or support statement specifying a lasting change to quota handling, rate limits, or agent execution beyond the one-time reset.** - 55%, 3-month horizon, due 2027-01-26. Signpost: A public product or support notice describes the changed quota or execution behavior and its scope. Source: [Kimi is trimming agent work before asking subscribers to trust its quota](https://newruntime.com/analysis/kimi-is-trimming-agent-work-before-asking-subscribers-to-trust-its-quota/)
- **Warp will disclose a concrete laboratory operating milestone, but that alone will not establish competitive service performance.** - 65%, 3-month horizon, due 2027-01-26. Signpost: A company statement or credible report describes an operating site or initial lab activity; no comparable throughput or quality data accompanies it. Source: [Warp’s real test is whether a US chemistry CRO can beat the status quo](https://newruntime.com/analysis/warp-s-real-test-is-whether-a-us-chemistry-cro-can-beat-the-status-quo/)
- **By 2027-01-26, at least one public agent product documentation or pricing page will explicitly describe usage or cost in terms of completed tasks or verified outcomes, rather than only sessions, tokens, or included allowance.** - 35%, 3-month horizon, due 2027-01-26. Signpost: A public product pricing page or documentation page introduces a task-completion or verified-outcome unit for agent usage. Resolves on 2027-01-26, yes if: A named agent product pricing page or documentation page explicitly defines a charge, quota, or cost metric by completed tasks or verified outcomes by 2027-01-26. Base rate: 35% (Low-confidence editorial estimate: usage pages often add new units as products mature, but the supplied items show no historical sample of outcome-based billing.). Source: [Agent value shifts from activity to verified work](https://newruntime.com/analysis/metadox-agent-value-shifts-from-activity-to-verified-work/)
- **By 2027-01-26, a public agent evaluation report will pair an executable outcome criterion with a reported resource-use measure for at least one agent task.** - 55%, 3-month horizon, due 2027-01-26. Signpost: An evaluation report presents both a checkable task result and a resource measure such as calls, tokens, or cost. Resolves on 2027-01-26, yes if: A public evaluation report or leaderboard names an agent task, states an executable or otherwise checkable outcome criterion, and reports resource use for that task by 2027-01-26. Base rate: 55% (Low-confidence editorial estimate: the items already describe outcome checks and agent benchmarks, but no comparable historical sample is supplied.). Source: [Agent value shifts from activity to verified work](https://newruntime.com/analysis/metadox-agent-value-shifts-from-activity-to-verified-work/)
- **A public incident or security report will describe additional PHP2Shell exploitation observations, without establishing the total number of compromised systems.** - 65%, 3-month horizon, due 2027-01-27. Signpost: A vendor, incident responder, or government advisory publishes a post-disclosure account of exploitation beyond the reported honeypot chain. Source: [Exploit timelines now outrun PHP fleet remediation](https://newruntime.com/analysis/exploit-timelines-now-outrun-php-fleet-remediation/)
- **An independently run Terminal-Bench 4.0 result for GPT-6.1 Terra is published and comes in at least 8 points below OpenAI's reported 50.3%.** - 35%, 3-month horizon, due 2027-01-27. Signpost: A third-party leaderboard or harness-maintainer run reporting Terra's score along with its reasoning-effort setting. Source: [Terra's lower list price doesn't tell you what Copilot will cost you](https://newruntime.com/analysis/terra-s-lower-list-price-doesn-t-tell-you-what-copilot-will-cost-you/)
- **GitHub publicly documents a Copilot per-model rate for GPT-6.1 Terra that a buyer can compare directly with GPT-6.1 Sol.** - 60%, 3-month horizon, due 2027-01-27. Signpost: Copilot billing or models docs listing Terra's rate next to Sol's. Source: [Terra's lower list price doesn't tell you what Copilot will cost you](https://newruntime.com/analysis/terra-s-lower-list-price-doesn-t-tell-you-what-copilot-will-cost-you/)
- **Publicly measurable fixed-version PHP hosts will increase, but version-based scans will continue to show a substantial affected population because unsupported systems cannot take a standard upstream update.** - 70%, 3-month horizon, due 2027-01-27. Signpost: A follow-up scan using disclosed comparable methodology reports more fixed hosts and continues to identify affected end-of-life versions. Source: [PHP2Shell’s headline numbers show exposure, not a universal exploit](https://newruntime.com/analysis/php2shell-s-headline-numbers-show-exposure-not-a-universal-exploit/)
- **Cursor publishes a usage-accounting change for bundled features such as Grok Imagine on unified plans: an exclusion from the pool, a separate allowance, or a toggle.** - 50%, 3-month horizon, due 2027-01-27. Signpost: A Cursor forum or changelog post naming Grok Imagine or included features alongside a change to how the weekly pool is counted. Source: [If you use Claude or GPT in Cursor, do the X Subscription math before you take a switch you can't undo](https://newruntime.com/analysis/if-you-use-claude-or-gpt-in-cursor-do-the-x-subscription-math-before-you-take-a/)
- **Entire publishes public pricing for its forge. Rationale: it says the product is available to any developer now, and charging requires published tiers.** - 60%, 3-month horizon, due 2027-01-27. Signpost: A pricing page on Entire's site listing per-seat or per-agent-run costs. Source: [Agent merge gates are probabilistic, so the job that matters is measuring how often they are wrong](https://newruntime.com/analysis/agent-merge-gates-are-probabilistic-so-the-job-that-matters-is-measuring-how/)
- **Anthropic will publish Continual Learning Bench task data or an evaluation harness under an Anthropic-controlled account or page.** - 25%, 3-month horizon, due 2027-02-02. Signpost: An Anthropic-controlled repository or dataset page links to Continual Learning Bench task data or an evaluation harness. Resolves on 2027-02-02, yes if: An Anthropic-controlled GitHub repository or dataset page links to Continual Learning Bench task data or an evaluation harness on 2027-02-02. Base rate: 25% (Judgment: public benchmark data or harness releases by the benchmark's named organization within three months are plausible but not assured.). Source: [More delegated work requires less unverified context](https://newruntime.com/analysis/metadox-more-delegated-work-requires-less-unverified-context/)
- **Anthropic will remove the research-preview or beta label from dreaming for Claude Managed Agents by 2027-02-02.** - 30%, 3-month horizon, due 2027-02-02. Signpost: Claude platform release notes or docs remove the research-preview or beta label from dreaming for Managed Agents. Resolves on 2027-02-02, yes if: Anthropic's Claude platform docs or release notes list dreaming for Managed Agents without a research-preview or beta label on 2027-02-02. Base rate: 30% (Judgment: a feature explicitly described as preview or beta can remain in that state beyond a three-month window.). Source: [More delegated work requires less unverified context](https://newruntime.com/analysis/metadox-more-delegated-work-requires-less-unverified-context/)
- **Dreaming for Claude Managed Agents will be declared generally available within three months.** - 30%, 3-month horizon, due 2027-02-05. Signpost: Claude platform release notes or docs drop a research-preview or beta label from dreaming, or list pricing for it. Resolves on 2027-02-05, yes if: The Claude platform release notes or Managed Agents docs describe dreaming as generally available, with no beta or research-preview label, on or before 2027-02-05. Base rate: 50% (archive: 2 of 4 earlier research stories saw a release within 90 days, too few cases to rely on; probability set by judgment). Source: [Anthropic's memory gains came with an answer key, and Claude's consumer products have yet to show they have one](https://newruntime.com/analysis/anthropic-s-memory-gains-came-with-an-answer-key-and-claude-s-consumer-products/)
- **Anthropic will publicly release Continual Learning Bench task data or an evaluation harness within three months.** - 25%, 3-month horizon, due 2027-02-05. Signpost: A Continual Learning Bench repository, dataset card or download link appears under an Anthropic-controlled account or page. Resolves on 2027-02-05, yes if: A public GitHub repository under the anthropics organization, a dataset on an Anthropic-controlled Hugging Face account, or a download link on anthropic.com provides Continual Learning Bench task data or harness code on or before 2027-02-05. Base rate: 30% (judgment: lab-internal benchmarks are often described before release; the 4-case archive base rate is too thin to use). Source: [Anthropic's memory gains came with an answer key, and Claude's consumer products have yet to show they have one](https://newruntime.com/analysis/anthropic-s-memory-gains-came-with-an-answer-key-and-claude-s-consumer-products/)
- **Google will publish latency SLAs and user fatigue guidelines for Gemini Live Avatar within 6 months, but only after internal user testing reveals critical thresholds for continuous speech tolerance.** - 40%, 6-month horizon, due 2027-03-26. Signpost: A Google Cloud blog post or developer documentation update that includes measured latency targets (e.g., <300ms for tool call responses) and explicit recommendations for fallback dialogue during delays. Source: [Gemini Live Avatar turns enterprise AI support into a 24/7 visual hostage situation](https://newruntime.com/analysis/gemini-live-avatar-turns-enterprise-ai-support-into-a-24-7-visual-hostage/)
- **BFL will announce an early‑access partnership with at least one robotics platform (e.g., a warehouse robot vendor) that provides a sandbox for fine‑tuning FLUX 3 Action on physical hardware.** - 55%, 6-month horizon, due 2027-03-26. Signpost: Press release, blog post, or GitHub repo from the partner describing a pilot deployment. Source: [Fast world‑action models will push robot control onto the edge](https://newruntime.com/analysis/fast-world-action-models-will-push-robot-control-onto-the-edge/)
- **Anthropic will publish more explicit submission or ranking guidance as the unified discovery experience rolls out.** - 70%, 6-month horizon, due 2027-03-26. Signpost: Portal documentation adds review criteria, ranking explanations, expected review times, or publisher guidance tied to listing performance. Source: [Claude plugins now depend on Anthropic’s distribution rules](https://newruntime.com/analysis/claude-plugins-now-depend-on-anthropic-s-distribution-rules/)
- **The paid-plan restriction will become a visible adoption constraint for small plugin developers.** - 55%, 6-month horizon, due 2027-03-26. Signpost: Developer discussions or submission guidance identify plan cost or eligibility as a reason to delay, abandon, or outsource directory submission. Source: [Claude plugins now depend on Anthropic’s distribution rules](https://newruntime.com/analysis/claude-plugins-now-depend-on-anthropic-s-distribution-rules/)
- **Google will announce a beta of a unified Gemini Agent Studio UI that merges chat and agent building, signaling a direct response to Microsoft’s Home.** - 55%, 6-month horizon, due 2027-03-27. Signpost: Google Cloud blog post (d7) mentions plans for a single‑pane Gemini Agent Studio with document editing integration. Source: [Microsoft’s Copilot Home reshapes the enterprise AI platform landscape](https://newruntime.com/analysis/microsoft-s-copilot-home-reshapes-the-enterprise-ai-platform-landscape/)
- **Within 6 months, research prototypes will combine self-generated curricula with a limited real-data seed instead of attempting a completely corpus-free pipeline.** - 65%, 6-month horizon, due 2027-03-27. Signpost: A public implementation or paper reports a hybrid schedule in which real data grounds evaluation while self-play selects or generates additional training tasks. Source: [Zero-data self-play could move pretraining spend from corpora to curriculum search](https://newruntime.com/analysis/zero-data-self-play-could-move-pretraining-spend-from-corpora-to-curriculum/)
- **At least one major AI lab will release an open‑source sandbox runtime that explicitly disables external DNS resolution for agents within six months.** - 60%, 6-month horizon, due 2027-03-27. Signpost: A GitHub release or announcement from Anthropic, DeepMind, or Meta AI that includes a sandbox configuration file with DNS disabled. Source: [OpenAI’s DNS Exfiltration Incident Shows Why DNS‑Only Filtering Fails for Autonomous Agents](https://newruntime.com/analysis/openai-s-dns-exfiltration-incident-shows-why-dns-only-filtering-fails-for/)
- **Cloud providers will launch managed AI-SQL inference services with query-plan metadata exposure within 6 months.** - 70%, 6-month horizon, due 2027-03-28. Signpost: AWS, Azure, or GCP announces a beta service for AI-SQL inference with plan-aware batching options in their cloud console. Source: [Quail proves AI-SQL workloads need a new kind of inference engine](https://newruntime.com/analysis/quail-proves-ai-sql-workloads-need-a-new-kind-of-inference-engine/)
- **By 6 months, at least 20% of Fortune 500 companies will deploy dedicated AI-agent sandbox platforms in their CI/CD pipelines, as evidenced by vendor announcements and cloud provider integrations (e.g., AWS or Azure sandbox-as-a-service offerings).** - 60%, 6-month horizon, due 2027-03-28. Signpost: Public announcements from cloud providers (e.g., AWS or Azure) of sandbox-as-a-service offerings tailored for AI agents, alongside case studies from Fortune 500 firms adopting these platforms. Source: [Claude Opus 4.5 and GPT-5.1 Cross the Reliability Threshold: What Developers Must Do Next](https://newruntime.com/analysis/claude-opus-4-5-and-gpt-5-1-cross-the-reliability-threshold-what-developers/)
- **Open-source sandbox frameworks for coding agents will see measurable adoption, with at least three major repositories (e.g., ‘agent-sandbox’, ‘code-agent-runtime’) gaining traction in enterprise environments, as indicated by increased contributions and enterprise adoption metrics.** - 55%, 6-month horizon, due 2027-03-28. Signpost: Metrics from GitHub (e.g., increased stars, forks, and enterprise integrations) alongside case studies from companies using open-source sandbox frameworks in production. Source: [Claude Opus 4.5 and GPT-5.1 Cross the Reliability Threshold: What Developers Must Do Next](https://newruntime.com/analysis/claude-opus-4-5-and-gpt-5-1-cross-the-reliability-threshold-what-developers/)
- **Enterprises will publish post‑mortems showing that unchecked tool‑call latency caused user fatigue, prompting new runtime latency SLAs.** - 40%, 6-month horizon, due 2027-03-28. Signpost: Google Cloud blog post titled "Latency SLAs for Gemini Live Avatar" or OpenAI developer doc announcing latency targets for tool calls. Source: [Task‑based pricing forces AI work from token consumption to runtime‑orchestrated, verified agent loops](https://newruntime.com/analysis/metadox-task-based-pricing-forces-ai-work-from-token-consumption-to-runtime/)
- **A sandbox runtime that disables external DNS resolution for agents will be open‑sourced by a leading lab.** - 60%, 6-month horizon, due 2027-03-28. Signpost: GitHub release named "SecureAgentSandbox" with a DNS‑off configuration file. Source: [Task‑based pricing forces AI work from token consumption to runtime‑orchestrated, verified agent loops](https://newruntime.com/analysis/metadox-task-based-pricing-forces-ai-work-from-token-consumption-to-runtime/)
- **By Q4 2026, at least 57% of enterprises running AI agents will have adopted a formal delegation API for agent actions** - 78%, 6-month horizon, due 2027-03-28. Signpost: Release notes from Google Cloud or Azure AI announcing granular permission scopes for Gemini/Claude agents, echoing the 57% figure reported by CB Insights "AI Agent Bible" (2025) Source: [Proactive AI teammates stumble on the invisible bottleneck of relational trust](https://newruntime.com/analysis/proactive-ai-teammates-stumble-on-the-invisible-bottleneck-of-relational-trust/)
- **Manus will publish additional product material or documentation describing how users inspect or control Automations and persistent execution, because those capabilities are central to the announced product and create operational questions.** - 60%, 6-month horizon, due 2027-03-29. Signpost: A Manus release note, help page or product announcement documents controls, execution history or failure handling for these workflows. Source: [Manus’s Efficiency Gains Are a Harness Result, Not an Agent Verdict](https://newruntime.com/analysis/manus-s-efficiency-gains-are-a-harness-result-not-an-agent-verdict/)
- **Teams processing 10M tokens/month will see a $1,200 annual savings by switching 50% of their bounded tasks to Sonnet 5.5, assuming a 30% token reduction and no quality degradation.** - 70%, 6-month horizon, due 2027-03-29. Signpost: Publicized cost-saving case studies from early adopters or a 20%+ increase in Sonnet 5.5 API calls in enterprise environments. Source: [Anthropic’s Sonnet 5.5: 30% faster, 30% cheaper—but only for tightly scoped tasks](https://newruntime.com/analysis/anthropic-s-sonnet-5-5-30-faster-30-cheaper-but-only-for-tightly-scoped-tasks/)
- **By month 6, Fireworks will publish a second workload-specific benchmark for FireRouter, focusing on a task type where routing achieves ≥25% cost savings with <1% accuracy drop (e.g., syntax correction).** - 75%, 6-month horizon, due 2027-03-29. Signpost: A Fireworks blog post or technical report details a new evaluation with explicit task segmentation, cost metrics, and accuracy thresholds, distinguishing between 'safe-to-route' and 'high-risk' tasks. Source: [FireRouter’s cost savings hide a hidden accuracy tax on coding tasks](https://newruntime.com/analysis/firerouter-s-cost-savings-hide-a-hidden-accuracy-tax-on-coding-tasks/)
- **The cache-hit loss from FireRouter will be mitigated by 30% within 6 months as teams adopt dynamic caching strategies (e.g., pre-warming caches for high-frequency tasks).** - 55%, 6-month horizon, due 2027-03-29. Signpost: Fireworks or third-party benchmarks report improved cache-hit ratios (>95%) for routed setups, attributed to caching optimizations tied to routing decisions. Source: [FireRouter’s cost savings hide a hidden accuracy tax on coding tasks](https://newruntime.com/analysis/firerouter-s-cost-savings-hide-a-hidden-accuracy-tax-on-coding-tasks/)
- **Within six months independent SMB reviews will compare Muse’s end‑to‑end workflow against Make, Zapier or Shopify Sidekick on a bounded task such as drafting a weekly sales summary.** - 60%, 6-month horizon, due 2027-03-30. Signpost: Published blog posts or video reviews that run the same task in Muse and in at least one competing automation platform, reporting accuracy and approval‑step counts. Source: [Muse’s real test is whether small businesses trust it with the next click](https://newruntime.com/analysis/muse-s-real-test-is-whether-small-businesses-trust-it-with-the-next-click/)
- **We expect the next wave of discussion about dots to focus on approval friction and user control, not only task demonstrations.** - 60%, 6-month horizon, due 2027-03-30. Signpost: Product updates, user reports, or enterprise evaluations that describe Auto-review behavior, approval rates, or pause and review controls. Source: [Dots makes permission design part of the agent, not an afterthought](https://newruntime.com/analysis/dots-makes-permission-design-part-of-the-agent-not-an-afterthought/)
- **Within six months, the share of new OpenAI coding‑agent projects that use `gpt-6.1-sol` will exceed 10% of total coding‑agent API calls** - 55%, 6-month horizon, due 2027-03-30. Signpost: OpenAI’s public API usage dashboard shows a steady rise in `gpt-6.1-sol` key creations and a corresponding dip in `gpt-5.6-sol` usage. Source: [Long‑context coding agents will reshape how we build AI‑driven development pipelines](https://newruntime.com/analysis/long-context-coding-agents-will-reshape-how-we-build-ai-driven-development/)
- **A further external evaluation will report task-level coding results for Argon, without resolving reliability across all long-output workflows.** - 55%, 6-month horizon, due 2027-04-01. Signpost: A third-party report publishes Argon coding results with a stated task set and methodology. Source: [Argon’s million-token ceiling still needs a coding test](https://newruntime.com/analysis/argon-s-million-token-ceiling-still-needs-a-coding-test/)
- **A follow-up analysis of AI-exposed employers will report absolute junior employment alongside junior share, making it possible to distinguish a compositional shift from a headcount decline.** - 60%, 6-month horizon, due 2027-04-01. Signpost: A published labor-market analysis presents both junior workforce share and absolute junior employment for a defined employer group. Source: [A falling junior share does not prove junior jobs are disappearing](https://newruntime.com/analysis/a-falling-junior-share-does-not-prove-junior-jobs-are-disappearing/)
- **Public examples of Managed Deep Agents HTTP channels will initially focus more on internal or human-supervised workflows than on unrestricted customer-facing actions.** - 55%, 6-month horizon, due 2027-04-01. Signpost: Published examples describe internal tools, support triage or review steps rather than agents taking external actions without oversight. Source: [HTTP channels make agents easier to wire in—and harder to trust blindly](https://newruntime.com/analysis/http-channels-make-agents-easier-to-wire-in-and-harder-to-trust-blindly/)
- **A public Suncatcher update will identify a follow-on hardware or formation step without demonstrating a production orbital ML service.** - 55%, 6-month horizon, due 2027-04-02. Signpost: Google names a next satellite, formation or networking test, with no customer-facing capacity or service availability. Source: [Suncatcher’s first satellite tests chips, not an orbital data center](https://newruntime.com/analysis/suncatcher-s-first-satellite-tests-chips-not-an-orbital-data-center/)
- **Earendil will publish a more specific Pi 1.0 example or guidance that demonstrates Codemode or deferred tool loading in a real tool workflow.** - 60%, 6-month horizon, due 2027-04-02. Signpost: A documentation update or release note shows a concrete workflow and describes how tools are composed or loaded. Source: [Pi is splitting tool complexity from agent persistence](https://newruntime.com/analysis/pi-is-splitting-tool-complexity-from-agent-persistence/)
- **A public customer or third-party account will report a workload-specific Sidecar result rather than only bridge-call latency.** - 45%, 6-month horizon, due 2027-04-02. Signpost: A published deployment or evaluation reports end-to-end latency and describes how egress enforcement was tested. Source: [A nearby proxy is useful only if agents cannot route around it](https://newruntime.com/analysis/a-nearby-proxy-is-useful-only-if-agents-cannot-route-around-it/)
- **A public evaluation or developer test of a streaming voice agent will report transcript revisions alongside action or tool-call behavior, rather than latency alone.** - 55%, 6-month horizon, due 2027-04-03. Signpost: A published test suite or case study logs partial/final transcript events and correlates them with tool calls or agent state changes. Source: [Fast partial transcripts make action control the real voice-agent test](https://newruntime.com/analysis/fast-partial-transcripts-make-action-control-the-real-voice-agent-test/)
- **OpenAI’s public Finances materials will continue to emphasize availability and stated scope more than measured reliability or user outcomes.** - 60%, 6-month horizon, due 2027-04-03. Signpost: A help-page or product update adds availability or feature details without publishing measured accuracy, adoption or outcome data. Source: [ChatGPT is making financial analysis a default interface, not a banking service](https://newruntime.com/analysis/chatgpt-is-making-financial-analysis-a-default-interface-not-a-banking-service/)
- **OpenAI will clarify at least one aspect of data freshness or incomplete records in its Finances help materials or interface.** - 50%, 6-month horizon, due 2027-04-03. Signpost: A public update explicitly explains a source-level refresh indicator, missing-record warning or correction path. Source: [ChatGPT is making financial analysis a default interface, not a banking service](https://newruntime.com/analysis/chatgpt-is-making-financial-analysis-a-default-interface-not-a-banking-service/)
- **Public reporting on AI-assisted research will increasingly include intermediate checks and human oversight alongside final outputs.** - 60%, 6-month horizon, due 2027-04-03. Signpost: A new research account or paper documents staged tasks and validation steps, rather than presenting only a final result. Source: [The physics speedup depends on a result experts can check](https://newruntime.com/analysis/the-physics-speedup-depends-on-a-result-experts-can-check/)
- **T3 Code will publish at least one update or issue response addressing a supported provider integration.** - 55%, 6-month horizon, due 2027-04-04. Signpost: A repository release, issue or pull request records a compatibility fix or integration change for a listed provider. Source: [T3 Code keeps the agent local; Cursor moves it to managed workers](https://newruntime.com/analysis/t3-code-keeps-the-agent-local-cursor-moves-it-to-managed-workers/)
- **A public evaluation or reproducible report will compare AgentCraft’s supervision flow with a conventional interface using an observable review or intervention measure.** - 40%, 6-month horizon, due 2027-04-04. Signpost: A published comparison reports a task, a conventional baseline and a measured reviewer outcome. Source: [AgentCraft’s real test is whether reviewers catch more mistakes](https://newruntime.com/analysis/agentcraft-s-real-test-is-whether-reviewers-catch-more-mistakes/)
- **Cloudflare will publish more detailed guidance about production deployment or security boundaries for Cloudflare OS.** - 60%, 6-month horizon, due 2027-04-04. Signpost: The repository adds deployment guidance, threat-model details, or a security evaluation beyond its early-access and non-production quick-start notices. Source: [Cloudflare OS treats agent permissions as a product problem](https://newruntime.com/analysis/cloudflare-os-treats-agent-permissions-as-a-product-problem/)
- **Northstar’s published Grid and Flexbox results will show measurable improvement from the roughly 57% figures cited in the dossier.** - 55%, 6-month horizon, due 2027-04-05. Signpost: A later published WPT report gives higher pass rates for Grid and Flexbox using identifiable category results. Source: [Northstar’s DOM strength runs ahead of its CSS readiness](https://newruntime.com/analysis/northstar-s-dom-strength-runs-ahead-of-its-css-readiness/)
- **The task force will publish a report within its stated 120-day period.** - 70%, 6-month horizon, due 2027-04-05. Signpost: A report appears by the end of the stated 120-day window, as dated in an official release or credible coverage. Source: [The task force’s restraint clause may define its security agenda](https://newruntime.com/analysis/the-task-force-s-restraint-clause-may-define-its-security-agenda/)
- **If a report is published, it will address both AI-enabled threats and the stated aim of avoiding overregulation rather than focusing exclusively on one side of the mandate.** - 65%, 6-month horizon, due 2027-04-05. Signpost: The report explicitly discusses both threat-response recommendations and limits or cautions on regulatory intervention. Source: [The task force’s restraint clause may define its security agenda](https://newruntime.com/analysis/the-task-force-s-restraint-clause-may-define-its-security-agenda/)
- **Within six months, at least two newly announced agent integrations or workflow releases will explicitly describe per-user, per-service, or per-action access controls alongside the integration, rather than only listing connectivity.** - 55%, 6-month horizon, due 2027-04-05. Signpost: Count release notes or product announcements meeting that description; revise down if fewer than two appear. Source: [Reusable agents spread faster than trust does](https://newruntime.com/analysis/metadox-reusable-agents-spread-faster-than-trust-does/)
- **Within six months, at least two public evaluations of agent efficiency improvements will report a quality or task-success measure alongside cost or speed, reflecting the tradeoff highlighted this week.** - 65%, 6-month horizon, due 2027-04-05. Signpost: Count evaluations that publish both an efficiency measure and a quality/task-success measure; this forecast builds on current analyses rather than assuming a universal practice. Source: [Reusable agents spread faster than trust does](https://newruntime.com/analysis/metadox-reusable-agents-spread-faster-than-trust-does/)
- **Public reporting or a court proceeding will add detail about the allegations or evidence in this case, though it may not resolve Anthropic’s review criteria.** - 50%, 6-month horizon, due 2027-04-06. Signpost: A reported filing, hearing, or attributable company statement supplies substantive new information about the case. Source: [One arrest does not establish a company-wide escalation rule](https://newruntime.com/analysis/one-arrest-does-not-establish-a-company-wide-escalation-rule/)
- **At least one published analysis or product case study will report agent workload economics using completed-task value or success alongside capacity or request counts.** - 55%, 6-month horizon, due 2027-04-06. Signpost: A public technical report, product document or case study includes a measured task-success or value metric alongside inference or capacity measures. Source: [Agent capacity is easier to project than agent demand](https://newruntime.com/analysis/agent-capacity-is-easier-to-project-than-agent-demand/)
- **A third party will publish a reproducible evaluation of Pareto on coding or agent tasks, making its setup and results inspectable.** - 50%, 6-month horizon, due 2027-04-06. Signpost: A public report names the task set, evaluation method, and results for Pareto. Source: [Pareto’s lower rates are a test of cost per successful task, not a cheaper bill by default](https://newruntime.com/analysis/pareto-s-lower-rates-are-a-test-of-cost-per-successful-task-not-a-cheaper-bill/)
- **A public comparison will measure at least two EmbeddingGemma 2 encoder or vector-size configurations on the same index and device.** - 55%, 6-month horizon, due 2027-04-07. Signpost: A reproducible evaluation discloses configuration differences and reports relevance, latency and memory for each. Source: [EmbeddingGemma 2 makes modularity the real edge advantage](https://newruntime.com/analysis/embeddinggemma-2-makes-modularity-the-real-edge-advantage/)
- **Flow’s documentation or public project discussion will clarify exactly-once behavior for at least one concrete source-and-sink combination.** - 65%, 6-month horizon, due 2027-04-07. Signpost: A documentation update, issue discussion or reproducible test names a connector pair and describes its retry or failure semantics. Source: [Flow’s exactly-once promise ends at the connector boundary](https://newruntime.com/analysis/flow-s-exactly-once-promise-ends-at-the-connector-boundary/)
- **A third party will publish a reproducible public-benchmark evaluation of Large 4, allowing at least one of Mistral’s reported coding or agentic results to be checked.** - 65%, 6-month horizon, due 2027-04-07. Signpost: A public harness run or independent report identifies its evaluation method and results. Source: [Large 4’s sovereignty case depends on weights, not the preview](https://newruntime.com/analysis/large-4-s-sovereignty-case-depends-on-weights-not-the-preview/)
- **OpenAI will publish at least one additional official example of an extension workflow using a documented surface, without reporting extension-specific adoption metrics.** - 55%, 6-month horizon, due 2027-04-08. Signpost: An official example or documentation update illustrates a surface workflow but provides no extension-level usage or retention data. Source: [A plugin surface is not a distribution channel](https://newruntime.com/analysis/a-plugin-surface-is-not-a-distribution-channel/)
- **Any public claim of productivity gains for this beta will need evidence beyond feature availability to distinguish time saved from time spent reviewing edits.** - 70%, 6-month horizon, due 2027-04-08. Signpost: A public evaluation reports task completion time alongside error correction, rejection, or reversal measures. Source: [Claude’s real test is whether edits beat copy-and-paste](https://newruntime.com/analysis/claude-s-real-test-is-whether-edits-beat-copy-and-paste/)
- **GitHub will add more explicit documentation of local sandbox policy scope or configuration, as managed enforcement requires buyers to understand what they are requiring.** - 55%, 6-month horizon, due 2027-04-08. Signpost: GitHub documentation adds a policy reference, defaults, or examples specifically describing local sandbox controls for files, networks, or credentials. Source: [Treat Copilot sandboxing as a preview until GitHub says otherwise](https://newruntime.com/analysis/treat-copilot-sandboxing-as-a-preview-until-github-says-otherwise/)
- **A public customer or partner account will report an OpenBPM 2.0 application upgrade with specific tests or required changes.** - 45%, 6-month horizon, due 2027-04-09. Signpost: A case report identifies the application migration path and describes smoke tests or changes beyond the announcement’s feature claims. Source: [OpenBPM 2.0’s compatibility promise needs a narrower test](https://newruntime.com/analysis/openbpm-2-0-s-compatibility-promise-needs-a-narrower-test/)
- **Anthropic will publish additional guidance or product documentation clarifying how Dashboards handles query review, data permissions or metric definitions.** - 65%, 6-month horizon, due 2027-04-09. Signpost: A Dashboards documentation or release update describes one or more of these controls or validation practices. Source: [Claude can write the SQL, but teams still own the metric](https://newruntime.com/analysis/claude-can-write-the-sql-but-teams-still-own-the-metric/)
- **A major streaming service will publicly discuss stream-manipulation controls or royalty treatment in a policy update or transparency statement.** - 45%, 6-month horizon, due 2027-04-09. Signpost: A platform announcement, policy page, or report explicitly addresses artificial listening and its effect on royalty treatment. Source: [AI scaled the fraud; the bots still made the money](https://newruntime.com/analysis/ai-scaled-the-fraud-the-bots-still-made-the-money/)
- **Google will disclose more explicit administrative controls for persistent agents, including identity, audit or policy details.** - 65%, 6-month horizon, due 2027-04-10. Signpost: Product documentation or a customer deployment describes how agent identities, tool permissions and activity logs are managed. Source: [Google is selling the work harness, not a winning model](https://newruntime.com/analysis/google-is-selling-the-work-harness-not-a-winning-model/)
- **Yandex will provide more information about restoration of the Sasovo AI-development supercomputers, though not necessarily a complete account of workloads or impacts.** - 55%, 6-month horizon, due 2027-04-10. Signpost: A public company update, interview or technical communication describes their repair, replacement or return to operation. Source: [Yandex’s recovery may be limited by capacity, not just damaged equipment](https://newruntime.com/analysis/yandex-s-recovery-may-be-limited-by-capacity-not-just-damaged-equipment/)
- **Any publicly observable follow-through will describe evaluator scope or process more readily than internal dissent or reporting outcomes.** - 60%, 6-month horizon, due 2027-04-10. Signpost: A public protocol or evaluation-access description appears, without a comparable public measure of internal reporting. Source: [Safety scrutiny depends on what outside evaluators can actually see](https://newruntime.com/analysis/safety-scrutiny-depends-on-what-outside-evaluators-can-actually-see/)
- **A public customer or independent comparison will report end-to-end results for Ultrafast against Sol Standard on at least one workload.** - 45%, 6-month horizon, due 2027-04-11. Signpost: A published case study or benchmark reports task completion time and quality for both settings. Source: [Ultrafast sells faster turns, not proven faster workflows](https://newruntime.com/analysis/ultrafast-sells-faster-turns-not-proven-faster-workflows/)
- **A public replication of Jev’s stopping result will report whether it holds on a separate retrieval query set, rather than relying only on Milvus’s 100-question test.** - 55%, 6-month horizon, due 2027-04-11. Signpost: An independent technical report tests Jev on another multi-hop retrieval set and publishes a Recall@5 result for the stopping task. Source: [Jev’s Search-Stop Win Belongs to One Step, Not the Whole Pipeline](https://newruntime.com/analysis/jev-s-search-stop-win-belongs-to-one-step-not-the-whole-pipeline/)
- **A team publishing a Jev retrieval evaluation will identify the exact model version used, given the documentation’s distinction between pinned and rolling versions.** - 55%, 6-month horizon, due 2027-04-11. Signpost: A public benchmark or implementation report names a pinned Jev version or provides equivalent model-version records. Source: [Jev’s Search-Stop Win Belongs to One Step, Not the Whole Pipeline](https://newruntime.com/analysis/jev-s-search-stop-win-belongs-to-one-step-not-the-whole-pipeline/)
- **Mecka or a customer will publicly describe a dataset’s coverage or a robot-training result beyond the funding announcement.** - 55%, 6-month horizon, due 2027-04-11. Signpost: A technical release or customer case study specifies a task, coverage measure or measured robot outcome. Source: [Compare human demonstrations with robot data before buying scale](https://newruntime.com/analysis/compare-human-demonstrations-with-robot-data-before-buying-scale/)
- **In a matched evaluation that separates context updating from constraint-wise auditing, the audit’s incremental exact-answer gain will be smaller than the reported 5.00-point context-update gain.** - 65%, 6-month horizon, due 2027-04-12. Signpost: A public ablation reports both component effects on the same task set and metric. Source: [AREX’s benchmark gains need a component-by-component test](https://newruntime.com/analysis/arex-s-benchmark-gains-need-a-component-by-component-test/)
- **A public AI-math assessment will include a proof-assistant verification result for at least one evaluated formal problem set.** - 70%, 6-month horizon, due 2027-04-12. Signpost: A paper or benchmark release reports kernel-checked proofs for a named set of problems, rather than only judging final answers. Source: [A checked proof is not the same as a valuable result](https://newruntime.com/analysis/a-checked-proof-is-not-the-same-as-a-valuable-result/)
- **At least one public AI-math evaluation will report resource use alongside its results, improving the basis for comparing demonstrations.** - 55%, 6-month horizon, due 2027-04-12. Signpost: A research paper or benchmark report publishes compute or tool-use details for its evaluated runs. Source: [A checked proof is not the same as a valuable result](https://newruntime.com/analysis/a-checked-proof-is-not-the-same-as-a-valuable-result/)
- **More public reporting on specialist compute providers will discuss customer commitments or utilization as evidence for planned expansion, rather than relying only on capacity announcements.** - 60%, 6-month horizon, due 2027-04-12. Signpost: A provider, lender or investor disclosure links a specific capacity expansion to named or described tenant commitments or utilization. Source: [AI capacity is only valuable when tenants keep it busy](https://newruntime.com/analysis/ai-capacity-is-only-valuable-when-tenants-keep-it-busy/)
- **Among enterprise-agent product releases or documentation updates published in the next six months, at least one will explicitly document both persistent workflow state and a user-visible control or review mechanism for that workflow; otherwise this forecast fails.** - 60%, 6-month horizon, due 2027-04-12. Signpost: A release note or product document names persistent state and an associated user-facing control or review surface in the same workflow. Source: [AI systems gain reach by surrendering the shortcut of trusting completion](https://newruntime.com/analysis/metadox-ai-systems-gain-reach-by-surrendering-the-shortcut-of-trusting-completion/)
- **In the next six months, at least one published AI evaluation guide or product deployment guide will specify an acceptance test across multiple workflow steps, rather than scoring only a model response; otherwise this forecast fails.** - 55%, 6-month horizon, due 2027-04-12. Signpost: A public guide defines success using a workflow rubric that includes a handoff, integration, or resulting action in addition to response quality. Source: [AI systems gain reach by surrendering the shortcut of trusting completion](https://newruntime.com/analysis/metadox-ai-systems-gain-reach-by-surrendering-the-shortcut-of-trusting-completion/)
- **Meta will publish the fuller safety report it says will follow.** - 70%, 6-month horizon, due 2027-04-13. Signpost: By April 12, 2027, Meta releases a safety report or evaluation document with additional testing relevant to agent behavior. Source: [Test what an agent keeps before trusting what it can finish](https://newruntime.com/analysis/test-what-an-agent-keeps-before-trusting-what-it-can-finish/)
- **Top-up authorization and visibility will become a material adoption question for team buyers using Cursor models beyond the included pool.** - 60%, 6-month horizon, due 2027-04-13. Signpost: Team documentation or customer discussions specifically address who can trigger top-ups and how those charges are surfaced. Source: [A weekly Grok pool makes model routing a team budget decision](https://newruntime.com/analysis/a-weekly-grok-pool-makes-model-routing-a-team-budget-decision/)
- **A follow-up public evaluation of MASS or a related trace-training method will report outcomes separately across task families, including at least one result that does not improve.** - 65%, 6-month horizon, due 2027-04-13. Signpost: A paper, repository update, or technical report publishes per-benchmark results for a repeated workflow-training run. Source: [MASS’s gains belong to specific tasks, not self-improvement in general](https://newruntime.com/analysis/mass-s-gains-belong-to-specific-tasks-not-self-improvement-in-general/)
- **If the company does not secure an actionable bid by its stated target, it will publicly announce a wind-down plan or revised process rather than silently treating the sale as complete.** - 60%, 6-month horizon, due 2027-04-14. Signpost: A company statement or court filing addresses shutdown, an extension, or the absence of an actionable proposal. Source: [One unusable offer from 28 contacts puts Character.ai’s sale on the clock](https://newruntime.com/analysis/one-unusable-offer-from-28-contacts-puts-character-ai-s-sale-on-the-clock/)
- **Any announced transaction will be accompanied by a public statement clarifying whether Character.ai’s service will continue under the buyer.** - 65%, 6-month horizon, due 2027-04-14. Signpost: The company or buyer states whether the platform will operate after the transaction. Source: [One unusable offer from 28 contacts puts Character.ai’s sale on the clock](https://newruntime.com/analysis/one-unusable-offer-from-28-contacts-puts-character-ai-s-sale-on-the-clock/)
- **Google will publish or update guidance that distinguishes Argon’s access or safety conditions across at least two of the named surfaces.** - 60%, 6-month horizon, due 2027-04-14. Signpost: A Google documentation or product update spells out differing eligibility, safeguards, or usage conditions for API, Antigravity, Gemini app, or AI Mode in Search. Source: [Argon’s wider launch tests whether safety gates can scale](https://newruntime.com/analysis/argon-s-wider-launch-tests-whether-safety-gates-can-scale/)
- **Public discussion of the task feature will focus on action boundaries and failure handling rather than the number of connected apps alone.** - 60%, 6-month horizon, due 2027-04-14. Signpost: Independent product coverage or evaluations describe concrete app actions, required user interventions, or task failures. Source: [Argon’s global rollout outruns the evidence on what it can safely do](https://newruntime.com/analysis/argon-s-global-rollout-outruns-the-evidence-on-what-it-can-safely-do/)
- **Modal will add a public indicator of sandbox usage beyond aggregate launch volume, such as a customer deployment or repeat-workload example.** - 55%, 6-month horizon, due 2027-04-15. Signpost: A Modal product or engineering post describes a customer deployment or repeat production workload for Sandboxes. Source: [Sandbox launches matter only when they become repeat paid work](https://newruntime.com/analysis/sandbox-launches-matter-only-when-they-become-repeat-paid-work/)
- **Public discussion of agent execution will increasingly distinguish successful task costs from environment or launch counts.** - 60%, 6-month horizon, due 2027-04-15. Signpost: A cloud provider, infrastructure vendor or independent practitioner publishes a comparison reporting cost per successful agent task. Source: [Sandbox launches matter only when they become repeat paid work](https://newruntime.com/analysis/sandbox-launches-matter-only-when-they-become-repeat-paid-work/)
- **Bumble will publicly describe at least one test or product change aimed at moving users from matching toward offline plans within six months.** - 60%, 6-month horizon, due 2027-04-15. Signpost: A Bumble announcement or product description identifies an offline-oriented feature or a concrete step from match to meeting. Source: [Bumble must make successful dates pay, not just more swipes](https://newruntime.com/analysis/bumble-must-make-successful-dates-pay-not-just-more-swipes/)
- **Independent evaluations of the subscription will compare task-level allowance use rather than relying only on the number of bundled products.** - 60%, 6-month horizon, due 2027-04-15. Signpost: A published review or comparison records tasks completed against an allowance and distinguishes eligible from excluded model use. Source: [A shared weekly pool turns Cursor and Grok into a trade-off](https://newruntime.com/analysis/a-shared-weekly-pool-turns-cursor-and-grok-into-a-trade-off/)
- **Salience will disclose a further commercialization milestone, such as a pre-production or manufacturing update, before it publishes independently verifiable field evidence.** - 60%, 6-month horizon, due 2027-04-16. Signpost: A company announcement or product update describes pre-production status, manufacturing readiness or customer evaluation, without independent operating data. Source: [Salience must prove its switch improves the whole fabric](https://newruntime.com/analysis/salience-must-prove-its-switch-improves-the-whole-fabric/)
- **A public, reproducible comparison will test Muse Wonder on coding tasks in Cursor or a comparable agent harness.** - 55%, 6-month horizon, due 2027-04-16. Signpost: A published side-by-side evaluation reports task outcomes and usage for Muse Wonder against named alternatives. Source: [Muse Wonder’s real test is cost per accepted change](https://newruntime.com/analysis/muse-wonder-s-real-test-is-cost-per-accepted-change/)
- **Vercel will name at least one additional model included in Token Pass.** - 60%, 6-month horizon, due 2027-04-16. Signpost: A Token Pass catalog or Vercel announcement lists another included model. Source: [Token Pass only saves money if teams use its narrow model allowance](https://newruntime.com/analysis/token-pass-only-saves-money-if-teams-use-its-narrow-model-allowance/)
- **At least one provider document or practitioner report will specify an effective context limit for a particular Muse Spark Open deployment configuration.** - 55%, 6-month horizon, due 2027-04-17. Signpost: A configuration-specific guide or report distinguishes the usable context limit from the advertised million-token window. Source: [Muse Spark Open is now testable inside a real coding workflow](https://newruntime.com/analysis/muse-spark-open-is-now-testable-inside-a-real-coding-workflow/)
- **At least one independent evaluation will publish enough task and scoring detail to assess Beam beyond the reported Plotly result.** - 65%, 6-month horizon, due 2027-04-17. Signpost: A public third-party report describes its task set, pass criteria, baseline, and Beam results. Source: [Beam’s token-efficiency bet still needs a workload-level proof](https://newruntime.com/analysis/beam-s-token-efficiency-bet-still-needs-a-workload-level-proof/)
- **Public provider documentation will continue to specify Beam deployment configurations rather than treating availability as an unqualified, one-size-fits-all service.** - 70%, 6-month horizon, due 2027-04-17. Signpost: A provider publishes or updates a Beam guide naming its serving setup and relevant deployment requirements. Source: [Beam’s token-efficiency bet still needs a workload-level proof](https://newruntime.com/analysis/beam-s-token-efficiency-bet-still-needs-a-workload-level-proof/)
- **Vercel or Reflection will publish additional information about Beam’s Gateway price, offer duration, or access limits.** - 65%, 6-month horizon, due 2027-04-17. Signpost: A public model-page update or provider announcement specifies paid rates, an expiry date, or revised limits. Source: [Treat Beam’s free window as an evaluation budget, not a service promise](https://newruntime.com/analysis/treat-beam-s-free-window-as-an-evaluation-budget-not-a-service-promise/)
- **Public evaluations of Beam will increasingly compare coding or agent task outcomes rather than relying only on launch claims or gateway traffic metrics.** - 45%, 6-month horizon, due 2027-04-17. Signpost: An independent or customer evaluation publishes task-level results and methodology for Beam against alternatives. Source: [Treat Beam’s free window as an evaluation budget, not a service promise](https://newruntime.com/analysis/treat-beam-s-free-window-as-an-evaluation-budget-not-a-service-promise/)
- **Cloudflare will publish at least one further public detail about what site owners can inspect when a Verified bot’s behavior is evaluated.** - 55%, 6-month horizon, due 2027-04-18. Signpost: A Cloudflare product or documentation update describes operator-facing reports, accessible evidence, or evaluation criteria. Source: [A bot flag matters only if publishers can inspect and challenge it](https://newruntime.com/analysis/a-bot-flag-matters-only-if-publishers-can-inspect-and-challenge-it/)
- **Independent evaluations will test Ling-3.1-flash on multiple representative agent or coding tasks, rather than relying only on a narrow launch-week result.** - 60%, 6-month horizon, due 2027-04-18. Signpost: A published evaluation discloses its methods and compares results across more than one workload category. Source: [Ling’s 25B-active label does not make it a small model to serve](https://newruntime.com/analysis/ling-s-25b-active-label-does-not-make-it-a-small-model-to-serve/)
- **Parecki will publish a status update on the planned automatic migration from IndieAuth.com to IndieKey.** - 55%, 6-month horizon, due 2027-04-18. Signpost: A project post or documentation gives a completion or progress update and states whether users must take action. Source: [A stable interface made webmention.io’s Ruby-to-PHP rewrite viable](https://newruntime.com/analysis/a-stable-interface-made-webmention-io-s-ruby-to-php-rewrite-viable/)
- **At least one public coding-agent evaluation will publish results broken out by task category or capability rather than only a single aggregate score.** - 65%, 6-month horizon, due 2027-04-19. Signpost: A benchmark report provides separate scores for distinct task types or capabilities, with methodology sufficient to compare them. Source: [Delegation moves forward when outcomes—not every action—are reviewable](https://newruntime.com/analysis/metadox-delegation-moves-forward-when-outcomes-not-every-action-are-reviewable/)
- **At least one team or vendor will publish a reproducible evaluation of agent task completion that includes both retry or recovery behavior and an independently checkable outcome.** - 55%, 6-month horizon, due 2027-04-19. Signpost: A release note, technical report, or benchmark records interrupted/resumed runs alongside outcome checks on named tasks. Source: [Delegation moves forward when outcomes—not every action—are reviewable](https://newruntime.com/analysis/metadox-delegation-moves-forward-when-outcomes-not-every-action-are-reviewable/)
- **Public developer trials will distinguish Glimmer’s performance by task type rather than treating its reported size-class lead as universal.** - 60%, 6-month horizon, due 2027-04-20. Signpost: Repositories, demos, or evaluation write-ups show both successful and unsuccessful tasks under stated conditions. Source: [Muse Glimmer’s benchmark lead is still a claim to test](https://newruntime.com/analysis/muse-glimmer-s-benchmark-lead-is-still-a-claim-to-test/)
- **At least one independent comparison will report a mixed result against Glimmer’s named peers rather than a consistent across-the-board lead.** - 65%, 6-month horizon, due 2027-04-20. Signpost: A reproducible evaluation reports tasks where Glimmer is competitive and tasks where Gemma4-31B or Qwen3.6-27B performs better. Source: [Muse Glimmer’s benchmark lead is still a claim to test](https://newruntime.com/analysis/muse-glimmer-s-benchmark-lead-is-still-a-claim-to-test/)
- **At least one public evaluation will compare IPO with a ratio-based mask on a different model or task and report both mismatch and task performance.** - 65%, 6-month horizon, due 2027-04-20. Signpost: A paper, repository report, or technical post describes paired runs outside the reported GLM-4.5-Air SWE RL recipe and includes both drift and task metrics. Source: [IPO makes asynchronous RL drift a measurable design choice](https://newruntime.com/analysis/ipo-makes-asynchronous-rl-drift-a-measurable-design-choice/)
- **Cloudflare publishes Clairic open weights with a stated licence on Hugging Face or a similar hub.** - 60%, 6-month horizon, due 2027-04-20. Signpost: A Clairic model card and licence file appear and are linked from Cloudflare's blog or Workers AI docs. Source: [With Clairic, extraction work shifts from fixing broken JSON to setting confidence thresholds](https://newruntime.com/analysis/with-clairic-extraction-work-shifts-from-fixing-broken-json-to-setting/)
- **An independent public evaluation reports Clairic's per-field accuracy against at least one frontier LLM structured-output mode.** - 40%, 6-month horizon, due 2027-04-20. Signpost: Clairic appears as a named entry in ExtractBench Pro results or in a third-party comparison post with numbers. Source: [With Clairic, extraction work shifts from fixing broken JSON to setting confidence thresholds](https://newruntime.com/analysis/with-clairic-extraction-work-shifts-from-fixing-broken-json-to-setting/)
- **MiniMax publishes M3.1 Flash weights with a stated license within 6 months of the October 19, 2026 announcement.** - 55%, 6-month horizon, due 2027-04-20. Signpost: An official MiniMax M3.1 Flash repository with a license file appears on Hugging Face or a similar hub. Source: [MiniMax is pricing M3.1 Flash to become the default cheap model in coding agents, but its "25x cheaper" claim needs a stated comparison](https://newruntime.com/analysis/minimax-is-pricing-m3-1-flash-to-become-the-default-cheap-model-in-coding/)
- **Independent matched evaluations will not establish a universal winner across all agentic tasks and local configurations.** - 70%, 6-month horizon, due 2027-04-20. Signpost: Published comparisons show different outcomes across tasks or configurations rather than confirming one model as consistently superior. Source: [Local GGUF tests cannot verify Liquid AI’s agent benchmark claim](https://newruntime.com/analysis/local-gguf-tests-cannot-verify-liquid-ai-s-agent-benchmark-claim/)
- **OpenAI publishes quantitative results (scores plus task descriptions) for its COBOL migration evaluation.** - 50%, 6-month horizon, due 2027-04-20. Signpost: A system card, paper or blog update with numeric COBOL migration scores and a description of the tasks or pass criteria. Source: [If OpenAI's COBOL gains hold up, the money in legacy modernization moves from rewriting code to proving the new code behaves like the old](https://newruntime.com/analysis/if-openai-s-cobol-gains-hold-up-the-money-in-legacy-modernization-moves-from/)
- **An independent group publishes a COBOLEval result, or a result on a comparable public COBOL benchmark, for an OpenAI model released after October 2026.** - 45%, 6-month horizon, due 2027-04-20. Signpost: An arXiv paper or public leaderboard entry listing a post-October-2026 OpenAI model on a public COBOL benchmark. Source: [If OpenAI's COBOL gains hold up, the money in legacy modernization moves from rewriting code to proving the new code behaves like the old](https://newruntime.com/analysis/if-openai-s-cobol-gains-hold-up-the-money-in-legacy-modernization-moves-from/)
- **A Voxtral 3 transcription model will appear with measured results in AssemblyAI's Voice Standard Bench or another public cross-vendor speech leaderboard.** - 60%, 6-month horizon, due 2027-04-21. Signpost: A public leaderboard row naming a Voxtral 3 model, with accuracy or latency figures measured by the benchmark operator, not copied from Mistral. Reasoning: Voice Standard Bench already ranks 50+ models, so including a major vendor's new model is likely. The main risk is that AssemblyAI is a competitor and may delay or skip it. Source: [Voxtral 3's EU-hosted voice agent may not stay in the EU: Mistral's own docs leave the agent layer open](https://newruntime.com/analysis/voxtral-3-s-eu-hosted-voice-agent-may-not-stay-in-the-eu-mistral-s-own-docs/)
- **Mistral will publish documentation that explicitly states whether the Voxtral 3 voice-agent SDK's stateful components are supported on its EU regional endpoint.** - 45%, 6-month horizon, due 2027-04-21. Signpost: Mistral's regional-inference page, or a Voxtral docs page, lists the voice-agent SDK or its session state as supported or unsupported on regional endpoints. Reasoning: the existing docs already list feature-level exclusions (d1), so an update is plausible. Vendors often leave such details to sales conversations, which is why this sits just under even odds. Source: [Voxtral 3's EU-hosted voice agent may not stay in the EU: Mistral's own docs leave the agent layer open](https://newruntime.com/analysis/voxtral-3-s-eu-hosted-voice-agent-may-not-stay-in-the-eu-mistral-s-own-docs/)
- **Eka’s public materials or a customer account will specify the comparison or test conditions behind its reported picking-rate advantage.** - 45%, 6-month horizon, due 2027-04-21. Signpost: A company or customer report names the baseline and describes the task and measurement protocol. Source: [Eka’s 2.5× picking claim needs a named baseline](https://newruntime.com/analysis/eka-s-2-5-picking-claim-needs-a-named-baseline/)
- **A party other than Humans& publishes Ampersand results on CooperBench or Collaborative Intelligence within 5 points of the self-reported 39.0% / 59.1%.** - 35%, 6-month horizon, due 2027-04-21. Signpost: An Ampersand entry appears on the public CooperBench page or in a third-party eval report. Source: [Humans& claims 39% on CooperBench, a benchmark that has no public Ampersand entry, and admits the model over-coaches. Our read: v0.1 is a bid to set the scoring rule for collaboration.](https://newruntime.com/analysis/humans-claims-39-on-cooperbench-a-benchmark-that-has-no-public-ampersand-entry/)
- **Humans& ships a successor model whose release reports lower interaction cost or less unwanted coaching than v0.1 on a named metric.** - 55%, 6-month horizon, due 2027-04-21. Signpost: A new model card with an interaction-cost or unsolicited-intervention comparison against v0.1. Source: [Humans& claims 39% on CooperBench, a benchmark that has no public Ampersand entry, and admits the model over-coaches. Our read: v0.1 is a bid to set the scoring rule for collaboration.](https://newruntime.com/analysis/humans-claims-39-on-cooperbench-a-benchmark-that-has-no-public-ampersand-entry/)
- **OpenAI publicly documents dated, callable Rosalind snapshots or a stated deprecation-notice window for Rosalind models.** - 45%, 6-month horizon, due 2027-04-21. Signpost: A Rosalind entry on OpenAI's deprecations page or in the API model list showing dated snapshot identifiers. Source: [GPT-Rosalind's gate comes from a biosecurity threshold, so labs must get version and notice terms before they build on it](https://newruntime.com/analysis/gpt-rosalind-s-gate-comes-from-a-biosecurity-threshold-so-labs-must-get-version/)
- **OpenAI publicly revises Rosalind trusted-access eligibility, for example with new tiers, narrowed use cases or sector or country restrictions.** - 35%, 6-month horizon, due 2027-04-21. Signpost: Updated trusted-access documentation for life sciences with changed criteria or access levels. Source: [GPT-Rosalind's gate comes from a biosecurity threshold, so labs must get version and notice terms before they build on it](https://newruntime.com/analysis/gpt-rosalind-s-gate-comes-from-a-biosecurity-threshold-so-labs-must-get-version/)
- **By 2027-04-21, Factory's documentation will describe scoping delegation credentials per app or per team, for example a separate service account or connector set for Linear than for Slack.** - 35%, 6-month horizon, due 2027-04-21. Signpost: The Factory Delegations docs or changelog mention per-app or per-team service accounts, credential scopes or connector allowlists. Rationale: the docs currently state that the configuration is shared and that changes can affect other apps, which enterprise least-privilege reviews will push against. We have no roadmap evidence, so the probability stays below even. Source: [Factory's Linear delegation lets anyone who can file an issue borrow the org's Git credentials](https://newruntime.com/analysis/factory-s-linear-delegation-lets-anyone-who-can-file-an-issue-borrow-the-org-s/)
- **At least one additional Linux distribution will publish incident-specific ca-certificates guidance or a package update.** - 60%, 6-month horizon, due 2027-04-21. Signpost: A distribution advisory explicitly identifying removal of affected eMudhra/emSign trust paths. Source: [A browser block cannot update the certificate bundle inside your app](https://newruntime.com/analysis/a-browser-block-cannot-update-the-certificate-bundle-inside-your-app/)
- **A public analysis will compare released in-silico scores with measured binding outcomes from this campaign.** - 60%, 6-month horizon, due 2027-04-21. Signpost: A notebook, preprint, or paper cites the dataset and reports a sequence-to-assay analysis. Source: [Claude’s scorpion-toxin binders remain one-toxin-at-a-time](https://newruntime.com/analysis/claude-s-scorpion-toxin-binders-remain-one-toxin-at-a-time/)
- **An independent third party (e.g., Artificial Analysis) will publish FLUX 3 Max generation-time measurements showing under 20 seconds for a 10-second clip at 720p.** - 55%, 6-month horizon, due 2027-04-21. Signpost: A latency or generation-time column that includes FLUX 3 Max appears on a public video leaderboard. Source: [FLUX 3 Max ties on quality and its speed figures come only from fal, but if they hold, reviewing a clip will take longer than rendering it](https://newruntime.com/analysis/flux-3-max-ties-on-quality-and-its-speed-figures-come-only-from-fal-but-if-they/)
- **At least one of ByteDance (Seedance), Alibaba (Wan) or Kling will launch a speed-branded video tier whose headline claim is under 30 seconds to generate a 10-second clip.** - 60%, 6-month horizon, due 2027-04-21. Signpost: A vendor launch post that puts a seconds-to-generate figure in its headline. Source: [FLUX 3 Max ties on quality and its speed figures come only from fal, but if they hold, reviewing a clip will take longer than rendering it](https://newruntime.com/analysis/flux-3-max-ties-on-quality-and-its-speed-figures-come-only-from-fal-but-if-they/)
- **Anthropic will publish additional guidance about how background work uses Duet subscribers’ plan limits.** - 55%, 6-month horizon, due 2027-04-22. Signpost: Updated Duet or plan documentation explains background-task usage in more specific terms. Source: [Claude Duet’s real test is finishing work before it needs you](https://newruntime.com/analysis/claude-duet-s-real-test-is-finishing-work-before-it-needs-you/)
- **OpenAI's php2shell-checker or a widely used fork adds package-manager or distribution-advisory checks to handle backports, beyond header and php -v comparison.** - 35%, 6-month horizon, due 2027-04-22. Signpost: A commit or release in the repository that queries dpkg/rpm or a distribution security tracker. Source: [The php2shell fix is a version number, and the tools people will use to check for it can't see it](https://newruntime.com/analysis/the-php2shell-fix-is-a-version-number-and-the-tools-people-will-use-to-check/)
- **CISA or DHS publicly clarifies whether self-hosted DeepSeek open weights fall under the 'built using DeepSeek technology' clause.** - 40%, 6-month horizon, due 2027-04-22. Signpost: A CISA FAQ, advisory or reported exception decision that specifically addresses on-premise open-weight deployments. Source: [The DeepSeek ban names one vendor, while unnamed alternatives sit one setting away in the same gateway](https://newruntime.com/analysis/the-deepseek-ban-names-one-vendor-while-unnamed-alternatives-sit-one-setting/)
- **At least one AI gateway or cloud model marketplace documents a control to restrict models by provider origin and explicitly references US government or federal compliance use.** - 45%, 6-month horizon, due 2027-04-22. Signpost: A changelog or documentation entry describing origin-based model allowlists that cites the DHS order or federal requirements. Source: [The DeepSeek ban names one vendor, while unnamed alternatives sit one setting away in the same gateway](https://newruntime.com/analysis/the-deepseek-ban-names-one-vendor-while-unnamed-alternatives-sit-one-setting/)
- **Within six months, public reporting will clarify whether php2shell led to confirmed compromises, distinguishing them from attempted exploitation.** - 55%, 6-month horizon, due 2027-04-22. Signpost: A credible security vendor or affected operator publishes forensic evidence or a documented compromise tied to either CVE. Source: [PHP’s leaked disclosure turned patch readiness into the real security test](https://newruntime.com/analysis/php-s-leaked-disclosure-turned-patch-readiness-into-the-real-security-test/)
- **Anthropic will publish or surface at least one concrete Duet preview signal beyond connector count, such as task outcomes or usage behavior, as it evaluates the product.** - 55%, 6-month horizon, due 2027-04-22. Signpost: A Duet product update or preview report includes a task-completion, usage-limit, or user-adoption measure. Source: [Claude Duet’s real test is whether delegation earns its place in the quota](https://newruntime.com/analysis/claude-duet-s-real-test-is-whether-delegation-earns-its-place-in-the-quota/)
- **The most visible near-term Duet use cases will remain preparation and drafting rather than autonomous execution of consequential transactions.** - 70%, 6-month horizon, due 2027-04-22. Signpost: Product materials or release notes emphasize briefs, drafts, and approval-mediated actions while retaining restrictions on high-impact operations. Source: [Claude Duet’s real test is whether delegation earns its place in the quota](https://newruntime.com/analysis/claude-duet-s-real-test-is-whether-delegation-earns-its-place-in-the-quota/)
- **A third party, not Recursive, will publish a Flint score on Terminal-Bench 2.1 or SWE-Bench Pro v2 with the harness and settings disclosed, and it will come in at least 3 points below Recursive's reported figure.** - 50%, 6-month horizon, due 2027-04-22. Signpost: A leaderboard entry or reproducible eval repository naming the agent harness, quantization and context settings used for Flint. Source: [Flint's speed claims hold only for one runtime at short context, and nobody has measured it on a laptop at long context](https://newruntime.com/analysis/flint-s-speed-claims-hold-only-for-one-runtime-at-short-context-and-nobody-has/)
- **Recursive or the community will publish Apple Silicon throughput or time-to-first-token figures for Flint at 100k+ context.** - 65%, 6-month horizon, due 2027-04-22. Signpost: A long-context table in rec release notes, or widely referenced llama.cpp/Ollama benchmark threads at 128k context on M4/M5 Macs. Source: [Flint's speed claims hold only for one runtime at short context, and nobody has measured it on a laptop at long context](https://newruntime.com/analysis/flint-s-speed-claims-hold-only-for-one-runtime-at-short-context-and-nobody-has/)
- **Anthropic extends Duet access to at least one non-US market or to Team plans.** - 45%, 6-month horizon, due 2027-04-22. Signpost: The Duet help-center article lists a non-US country or Team plans as supported. Source: [Claude Duet is aimed at small-business admin, and its one-model, shared-quota, approval-gated design matters more than its shopping demo](https://newruntime.com/analysis/claude-duet-is-aimed-at-small-business-admin-and-its-one-model-shared-quota/)
- **A publicly reported prompt-injection or unintended-action issue involving Duet's browser or connectors surfaces.** - 35%, 6-month horizon, due 2027-04-22. Signpost: A security researcher write-up or bug bounty disclosure names Duet. Source: [Claude Duet is aimed at small-business admin, and its one-model, shared-quota, approval-gated design matters more than its shopping demo](https://newruntime.com/analysis/claude-duet-is-aimed-at-small-business-admin-and-its-one-model-shared-quota/)
- **Cohere publicly documents a confidential-computing option for Model Vault, built on NVIDIA confidential computing, that lists Rerank 5 as deployable.** - 45%, 6-month horizon, due 2027-04-22. Signpost: Cohere docs or its pricing page describe a confidential Vault option, with attestation documentation, that names Rerank 5. Source: [Rerank 5 costs about a tenth of a cent per query, and our bet is that Cohere earns its margin in Vault, not the API](https://newruntime.com/analysis/rerank-5-costs-about-a-tenth-of-a-cent-per-query-and-our-bet-is-that-cohere/)
- **A public comparison will test Flint against another coding model using matched hardware, runtime, context and task conditions.** - 50%, 6-month horizon, due 2027-04-23. Signpost: A comparison report specifies the same evaluation setup for Flint and at least one alternative and reports task-level results. Source: [Flint has to prove it works beyond its showcase setup](https://newruntime.com/analysis/flint-has-to-prove-it-works-beyond-its-showcase-setup/)
- **An independent group publishes a Timestral-209M GIFT-Eval MASE within 0.02 of Mistral's reported 0.658.** - 50%, 6-month horizon, due 2027-04-23. Signpost: A third-party leaderboard entry, paper or blog reporting Timestral-209M MASE between 0.638 and 0.678. Reasoning: open weights make reproduction easy, but differences in harness setup often shift aggregates by more than 0.02. Source: [IBM's own numbers show four forecasters averaged together buy almost nothing, and Timestral's lead still needs a matched harness](https://newruntime.com/analysis/ibm-s-own-numbers-show-four-forecasters-averaged-together-buy-almost-nothing/)
- **Within six months, at least one public third-party implementation or technical write-up will report a Decisions workload with an explicit evaluation set, rather than merely repeating OpenAI’s speed claim.** - 55%, 6-month horizon, due 2027-04-23. Signpost: A public repository, integration guide or write-up shows representative inputs and reports decision-quality results for a defined task. Source: [Closed answer sets make model decisions an application design problem](https://newruntime.com/analysis/closed-answer-sets-make-model-decisions-an-application-design-problem/)
- **Within six months, developers building GPT-Live applications will publish examples or discussions that distinguish transcript-delta triggering from decisions made after a complete utterance.** - 55%, 6-month horizon, due 2027-04-23. Signpost: A public example or developer discussion documents when the call is triggered and how partial or changing transcript inputs are handled. Source: [Closed answer sets make model decisions an application design problem](https://newruntime.com/analysis/closed-answer-sets-make-model-decisions-an-application-design-problem/)
- **Cohere documents a confidential Model Vault deployment target other than Azure H100, either Blackwell-class GPUs or NVIDIA Confidential Bare Metal.** - 40%, 6-month horizon, due 2027-04-23. Signpost: A Cohere docs or blog page naming GB200/GB300, Rubin or Confidential Bare Metal as a supported encrypted-vault target. Source: [Cohere's confidential inference moves trust from the model vendor to two hardware anchors, and nobody has said whether you can verify without them](https://newruntime.com/analysis/cohere-s-confidential-inference-moves-trust-from-the-model-vendor-to-two/)
- **Cohere publishes GA status or its own latency/throughput overhead figures for confidential Model Vault.** - 40%, 6-month horizon, due 2027-04-23. Signpost: Cohere docs listing GA, regions, or a benchmark comparing encrypted and standard vault performance. Source: [Cohere's confidential inference moves trust from the model vendor to two hardware anchors, and nobody has said whether you can verify without them](https://newruntime.com/analysis/cohere-s-confidential-inference-moves-trust-from-the-model-vendor-to-two/)
- **Anthropic-managed Claude on Google Cloud adds at least one named regional endpoint beyond US and Global, such as EU.** - 50%, 6-month horizon, due 2027-04-23. Signpost: Anthropic or Google Cloud documentation lists a new regional endpoint for the Anthropic-managed offering. Source: [On Google Cloud, Anthropic's agent features now come through Anthropic's own service, billed through Google](https://newruntime.com/analysis/on-google-cloud-anthropic-s-agent-features-now-come-through-anthropic-s-own/)
- **At least one new Claude Platform beta is documented as supported on the Anthropic-managed Google Cloud path but missing from Google's partner-model Claude documentation at launch.** - 70%, 6-month horizon, due 2027-04-23. Signpost: Release notes name Anthropic-managed Google Cloud as supported, while Google's Claude partner-model page omits the feature. Source: [On Google Cloud, Anthropic's agent features now come through Anthropic's own service, billed through Google](https://newruntime.com/analysis/on-google-cloud-anthropic-s-agent-features-now-come-through-anthropic-s-own/)
- **Cohere publishes either GA pricing or a general-availability date for Model Vault confidential computing.** - 50%, 6-month horizon, due 2027-04-23. Signpost: A Cohere pricing page, docs page or blog post that states an encrypted-vault price or a GA date. Coin-flip odds: public betas often reach GA within two quarters, but Cohere has given no timeline. Source: [Attested inference stops the vendor reading your prompts, not the vendor cutting you off, and both sovereignty routes run on NVIDIA's root of trust](https://newruntime.com/analysis/attested-inference-stops-the-vendor-reading-your-prompts-not-the-vendor-cutting/)
- **Another company publicly announces a company-wide ChatGPT Work deployment covering at least 10,000 employees.** - 60%, 6-month horizon, due 2027-04-23. Signpost: An OpenAI customer post naming a second enterprise-wide ChatGPT Work rollout with a headcount figure. Source: [If OpenAI is following Microsoft's enterprise path, its security story will live in contracts rather than on patch days](https://newruntime.com/analysis/if-openai-is-following-microsoft-s-enterprise-path-its-security-story-will-live/)
- **A public third-party evaluation will test OlmoEarth on a named downstream mapping task and report results for a specified geography.** - 60%, 6-month horizon, due 2027-04-23. Signpost: A reproducible public report or repository provides task and region-specific evaluation results. Source: [OlmoEarth’s cost advantage is reusable inference, not cheap pretraining](https://newruntime.com/analysis/olmoearth-s-cost-advantage-is-reusable-inference-not-cheap-pretraining/)
- **OpenAI will partially restore Pro 200's included Work/Codex allowance above 10x Plus.** - 20%, 6-month horizon, due 2027-04-24. Signpost: A Help Center or pricing-page revision raising the Pro 200 multiple. The probability is low because OpenAI explicitly refused to restore the five-hour limit, which points to a deliberate repricing. Source: [Pro 200 loses its usage-per-dollar edge over Plus, and Pro 500 sells speed rather than cheaper compute](https://newruntime.com/analysis/pro-200-loses-its-usage-per-dollar-edge-over-plus-and-pro-500-sells-speed/)
- **Anthropic will introduce an individual Claude plan priced above its current highest individual tier.** - 35%, 6-month horizon, due 2027-04-24. Signpost: A new tier on Anthropic's pricing page above its current top plan. The probability is moderate because a $500 OpenAI tier creates room to price above it, but competitors may prefer to win over Pro 200 users who leave. Source: [Pro 200 loses its usage-per-dollar edge over Plus, and Pro 500 sells speed rather than cheaper compute](https://newruntime.com/analysis/pro-200-loses-its-usage-per-dollar-edge-over-plus-and-pro-500-sells-speed/)
- **A public comparison will include M3.1-Flash alongside the independent Vals AI results and make its evaluation setup explicit.** - 50%, 6-month horizon, due 2027-04-24. Signpost: A third-party report names the model version and method and publishes side-by-side task results. Source: [Independent tests put MiniMax’s agent claims on a narrower footing](https://newruntime.com/analysis/independent-tests-put-minimax-s-agent-claims-on-a-narrower-footing/)
- **Public self-hosting guidance for M3.1-Flash will document at least one concrete hardware and quantization setup, reducing uncertainty about practical deployment conditions.** - 50%, 6-month horizon, due 2027-04-24. Signpost: A reproducible guide or report states hardware, quantization settings, and measured inference performance. Source: [Independent tests put MiniMax’s agent claims on a narrower footing](https://newruntime.com/analysis/independent-tests-put-minimax-s-agent-claims-on-a-narrower-footing/)
- **By 2027-04-30, at least one Claude Platform feature or beta will appear in Anthropic's Anthropic-managed Google Cloud documentation (d2) while Google's partner-model docs for the Google-managed Claude route do not list it, and the gap will last 30 days or more.** - 60%, 6-month horizon, due 2027-04-24. Signpost: Compare the feature list on platform.claude.com's Anthropic-managed page with Google Cloud's Google-managed Claude docs every month. Reason for the probability: the same-day promise applies only to the Anthropic route, and Managed Agents and the MCP connector are still in beta. Source: [On Google Cloud, Google's lock-in tools now come only with the slower Claude route](https://newruntime.com/analysis/on-google-cloud-google-s-lock-in-tools-now-come-only-with-the-slower-claude/)
- **By 2027-04-30, Google Cloud documentation will state that Model Armor or Agent Engine works with the Anthropic-managed Claude route.** - 25%, 6-month horizon, due 2027-04-24. Signpost: Google's Anthropic-managed page (d1) or the Model Armor/Agent Engine docs naming the Anthropic-managed route. Reason the probability is low: the announcement presents these integrations as reasons to choose the Google-managed route. Source: [On Google Cloud, Google's lock-in tools now come only with the slower Claude route](https://newruntime.com/analysis/on-google-cloud-google-s-lock-in-tools-now-come-only-with-the-slower-claude/)
- **Anthropic documents a specific API response indicator (stop reason, error type or response field) that tells the caller a request was blocked by a safeguard or served by the Sonnet 5 cyber fallback.** - 45%, 6-month horizon, due 2027-04-24. Signpost: An entry in Anthropic's API docs or changelog naming the indicator and describing when it is returned. Source: [Sonnet 5.5's 30% discount is Anthropic's per-token claim; your job now is proving it per task through a policy layer](https://newruntime.com/analysis/sonnet-5-5-s-30-discount-is-anthropic-s-per-token-claim-your-job-now-is-proving/)
- **OpenAI will clarify at least one concrete eligibility or usage condition for Codex cloud environments or delegated Codex workflows.** - 65%, 6-month horizon, due 2027-04-24. Signpost: A product page, help document or release note specifies which plans can use the feature or what limits apply. Source: [Codex cloud shifts the test from model speed to control of the work](https://newruntime.com/analysis/codex-cloud-shifts-the-test-from-model-speed-to-control-of-the-work/)
- **A credible hands-on report will compare Codex cloud execution with a local or competing workflow on at least one operational measure beyond model output quality.** - 55%, 6-month horizon, due 2027-04-24. Signpost: A published evaluation reports a measured difference in setup time, task completion, review effort, portability or cost. Source: [Codex cloud shifts the test from model speed to control of the work](https://newruntime.com/analysis/codex-cloud-shifts-the-test-from-model-speed-to-control-of-the-work/)
- **OpenAI will document controls on who may trigger a Team Task or which channels may trigger it, or a per-run permission check, beyond workspace-level admin permissions.** - 60%, 6-month horizon, due 2027-04-24. Signpost: Help-center or Enterprise release notes adding trigger allowlists, per-Space connector scoping, or per-run audit logs for Team Tasks. Source: [Once ChatGPT agents run under a team account, who can trigger them matters as much as what they can read](https://newruntime.com/analysis/once-chatgpt-agents-run-under-a-team-account-who-can-trigger-them-matters-as/)
- **Dots will be offered on ChatGPT Plus or Free plans.** - 30%, 6-month horizon, due 2027-04-24. Signpost: OpenAI release notes listing Dots availability for Plus or Free. Source: [Once ChatGPT agents run under a team account, who can trigger them matters as much as what they can read](https://newruntime.com/analysis/once-chatgpt-agents-run-under-a-team-account-who-can-trigger-them-matters-as/)
- **At least one third-party evaluation will report K3.1 Pro output use or cost on a named workload, clarifying how its index measurements compare with practical tasks.** - 65%, 6-month horizon, due 2027-04-24. Signpost: A published independent evaluation gives token use or spend for defined coding, long-context, or agent tasks. Source: [Kimi K3.1 Pro’s token price is not its task price](https://newruntime.com/analysis/kimi-k3-1-pro-s-token-price-is-not-its-task-price/)
- **Anthropic documentation will list the same computer-use tool version for Amazon Bedrock as for the Claude API, ending the split between `computer_20251124` and `computer_toolset_20260801`.** - 50%, 6-month horizon, due 2027-04-24. Signpost: A release-notes or Bedrock docs entry naming `computer_toolset_20260801` (or one shared successor) as supported on Bedrock. Source: [Haiku 5.5 is safe to fail over between providers for classification, not for its agents](https://newruntime.com/analysis/haiku-5-5-is-safe-to-fail-over-between-providers-for-classification-not-for-its/)
- **Anthropic will publish a dated retirement for Claude Haiku 4.5, forcing pipelines onto the 2026-10-21 request semantics.** - 45%, 6-month horizon, due 2027-04-24. Signpost: Haiku 4.5 marked deprecated or legacy with a retirement date on Anthropic's models or deprecations page. Source: [Haiku 5.5 is safe to fail over between providers for classification, not for its agents](https://newruntime.com/analysis/haiku-5-5-is-safe-to-fail-over-between-providers-for-classification-not-for-its/)
- **GitLab ships at least one more patch rated CVSS 9.0 or higher for a regex or pattern-compilation flaw.** - 40%, 6-month horizon, due 2027-04-25. Signpost: A GitLab patch-release notice describing another regex-related critical, especially one crediting the same researcher. Source: [A human bounty hunter found GitLab's 12-year-old CVSS 10.0 bug, and the new AI repo scanners don't look at the platform layer where it lived](https://newruntime.com/analysis/a-human-bounty-hunter-found-gitlab-s-12-year-old-cvss-10-0-bug-and-the-new-ai/)
- **NVIDIA updates the Bolt E4B card or report to state explicitly how the 4 GB figure is counted (context length, embeddings, drafter included or not).** - 30%, 6-month horizon, due 2027-04-25. Signpost: A model card revision adding a memory table with context length and component breakdown. Source: [The "4GB" in Nemotron 3.5 Bolt E4B is a memory target, not what you will download or run](https://newruntime.com/analysis/the-4gb-in-nemotron-3-5-bolt-e4b-is-a-memory-target-not-what-you-will-download/)
- **A public OpenAI evaluation or safety document will test whether coding agents can suppress or bypass monitoring alerts, not merely whether they alter monitored code.** - 55%, 6-month horizon, due 2027-04-25. Signpost: A published evaluation protocol or results explicitly includes alert suppression or monitor-evasion scenarios. Source: [Agent oversight needs a human escalation path outside the agent’s reach](https://newruntime.com/analysis/agent-oversight-needs-a-human-escalation-path-outside-the-agent-s-reach/)
- **At least one of OpenAI, Anthropic or Google will announce a new credential control aimed at third-party tools, such as scoped or expiring API keys or automatic revocation of leaked keys.** - 45%, 6-month horizon, due 2027-04-25. Signpost: A provider changelog or docs entry introducing short-lived or narrowly scoped keys meant for third-party integrations. Source: [Hiding provider keys behind a gateway only moves the pile; short-lived, scoped keys are what limit a breach](https://newruntime.com/analysis/hiding-provider-keys-behind-a-gateway-only-moves-the-pile-short-lived-scoped/)
- **llama.cpp or vLLM merges native support for DFlash drafters, so Bolt's speculative decoding works outside NVIDIA's own recipes.** - 40%, 6-month horizon, due 2027-04-25. Signpost: A merged upstream PR or release note naming DFlash, or NVIDIA replacing 'pending' on the Hugging Face card with a working llama.cpp recipe. Source: [NVIDIA tuned Bolt E4B to answer fast in 4 GB, not to beat Gemma on raw capability](https://newruntime.com/analysis/nvidia-tuned-bolt-e4b-to-answer-fast-in-4-gb-not-to-beat-gemma-on-raw-capability/)
- **NVIDIA ships another Bolt-line model post-trained from a non-NVIDIA open base.** - 50%, 6-month horizon, due 2027-04-25. Signpost: A new nvidia-org Hugging Face card in the Bolt line stating it was post-trained from a third-party base model. Source: [NVIDIA tuned Bolt E4B to answer fast in 4 GB, not to beat Gemma on raw capability](https://newruntime.com/analysis/nvidia-tuned-bolt-e4b-to-answer-fast-in-4-gb-not-to-beat-gemma-on-raw-capability/)
- **At least one model router or gateway provider publicly restricts OpenAI model access for some customers and cites the new intermediary policy as the reason. Rationale for 0.3: quiet bulk approval of the large gateways is the more likely path, so a public restriction requires either strict enforcement or a smaller provider being refused.** - 30%, 6-month horizon, due 2027-04-25. Signpost: A changelog, status page or blog post from a gateway provider naming OpenAI's Usage Policies as the reason for limiting OpenAI models. Source: [OpenAI's approval rule for gateways makes the model router the riskiest part of your stack, so keep your ability to switch models in MCP and skills](https://newruntime.com/analysis/openai-s-approval-rule-for-gateways-makes-the-model-router-the-riskiest-part-of/)
- **At least one third party will publish a reproducible K3.1 Pro coding or agent evaluation with task setup and tool conditions disclosed.** - 70%, 6-month horizon, due 2027-04-25. Signpost: A public report includes methods and task-level outcomes, rather than only repeating Moonshot’s scores. Source: [Kimi’s post-training pipeline is the claim worth testing](https://newruntime.com/analysis/kimi-s-post-training-pipeline-is-the-claim-worth-testing/)
- **Moonshot will add a more specific public description of the cyber controls or their evaluation for the open-weight version.** - 55%, 6-month horizon, due 2027-04-25. Signpost: An official technical note identifies control measures or evaluation procedures beyond the current general description. Source: [Kimi’s post-training pipeline is the claim worth testing](https://newruntime.com/analysis/kimi-s-post-training-pipeline-is-the-claim-worth-testing/)
- **An independent public evaluation will compare K3.1 Pro with K3 on at least one named coding or agent workload and report task success alongside time or cost.** - 70%, 6-month horizon, due 2027-04-25. Signpost: A reproducible report publishes its workload, methodology, and comparative outcome measures. Source: [Kimi K3.1 Pro is already useful, but open weights remain the real test](https://newruntime.com/analysis/kimi-k3-1-pro-is-already-useful-but-open-weights-remain-the-real-test/)
- **NVIDIA releases at least one more open-weight model whose card pairs a BF16 checkpoint for post-training with a separate NVFP4 deployment release.** - 80%, 6-month horizon, due 2027-04-26. Signpost: A new NVIDIA Hugging Face card with paired BF16 and NVFP4 repositories and the same split in recommended uses. Source: [Nemotron 3.5 Lightning's BF16 weights are the teacher, and the Blackwell-only NVFP4 build is the product](https://newruntime.com/analysis/nemotron-3-5-lightning-s-bf16-weights-are-the-teacher-and-the-blackwell-only/)
- **Vercel's free nvidia/nemotron-3.5-lightning-free endpoint gets tighter limits, becomes paid, or is retired.** - 40%, 6-month horizon, due 2027-04-26. Signpost: A Vercel changelog entry or AI Gateway model page changing the pricing or status of the free model ID. Source: [Nemotron 3.5 Lightning's BF16 weights are the teacher, and the Blackwell-only NVFP4 build is the product](https://newruntime.com/analysis/nemotron-3-5-lightning-s-bf16-weights-are-the-teacher-and-the-blackwell-only/)
- **Black Forest Labs publishes an explicit price for hosted LoRA training (per job, per step or per image trained).** - 60%, 6-month horizon, due 2027-04-26. Signpost: A LoRA training line item on bfl.ai/pricing or in a release-notes entry, or the beta label replaced by general-availability terms. Source: [BFL's hosted price is about a cent per image; licence terms and LoRA export will decide the economics](https://newruntime.com/analysis/bfl-s-hosted-price-is-about-a-cent-per-image-licence-terms-and-lora-export-will/)
- **StepFun reconciles the API docs and the model card so that both list the same input modalities and maximum output, or documents the difference explicitly.** - 50%, 6-month horizon, due 2027-04-26. Signpost: An updated docs page or card revision where the video input and output-limit entries match or carry an explanation. Source: [Step 5 Preview plugs into Claude Code, but nothing published yet shows it is a drop-in swap](https://newruntime.com/analysis/step-5-preview-plugs-into-claude-code-but-nothing-published-yet-shows-it-is-a/)
- **At least one widely used third-party local runtime or gateway (e.g. llama.cpp server, Ollama, or another gateway besides Vercel) ships a route explicitly compatible with a vendor Decisions API.** - 35%, 6-month horizon, due 2027-04-26. Signpost: Release notes or a merged PR adding a /v1/decisions-style endpoint returning per-question probabilities. Source: [Decision APIs are repeating the chat-completions playbook, and once again the request shape will port while the probabilities will not](https://newruntime.com/analysis/decision-apis-are-repeating-the-chat-completions-playbook-and-once-again-the/)
- **Vercel AI Gateway, or another multi-provider gateway, lists OpenAI's Decisions models under the same decision modality as Perplexity's Decider, which would show a normalised cross-vendor schema.** - 50%, 6-month horizon, due 2027-04-26. Signpost: A gateway changelog entry adding gpt-6-luna (or a successor) as a decision model next to pplx-decider-v1.2. Source: [Decision APIs are repeating the chat-completions playbook, and once again the request shape will port while the probabilities will not](https://newruntime.com/analysis/decision-apis-are-repeating-the-chat-completions-playbook-and-once-again-the/)
- **Documented K3.1 Pro rate-limit or quota-burn complaints will recur after the reset if the underlying service or execution issue remains unresolved.** - 45%, 6-month horizon, due 2027-04-26. Signpost: A company notice or multiple dated user reports document renewed quota or rate-limit problems after the reset. Source: [Kimi is trimming agent work before asking subscribers to trust its quota](https://newruntime.com/analysis/kimi-is-trimming-agent-work-before-asking-subscribers-to-trust-its-quota/)
- **Judgmental estimate: within 6 months, at least two of the next six New Runtime items describing agent deployments or workflows will explicitly name a verifier, review step, or acceptance criterion; otherwise this prediction fails.** - 60%, 6-month horizon, due 2027-04-26. Signpost: Count the next six relevant items; look for explicit verification or acceptance criteria, not generic safety language. Source: [Agent work scales by narrowing where effort goes](https://newruntime.com/analysis/metadox-agent-work-scales-by-narrowing-where-effort-goes/)
- **Anthropic's or OpenAI's official docs for Claude Code or Codex CLI will add explicit guidance on what the agent should do when repository instruction files conflict with existing code. Reasoning: guidance in docs is cheap and the preprint names both products, but vendors often take longer than six months to respond to a preprint.** - 30%, 6-month horizon, due 2027-04-26. Signpost: A page on code.claude.com or OpenAI's Codex docs or README that mentions instruction-vs-code conflicts, stale AGENTS.md/CLAUDE.md, or a recommended precedence sentence. Source: [Coding agents can spot a stale AGENTS.md and still obey it, so make them report the conflict instead of choosing silently](https://newruntime.com/analysis/coding-agents-can-spot-a-stale-agents-md-and-still-obey-it-so-make-them-report/)
- **The davila7/claude-code-templates /stack viewer will add scanning of nested .claude/ directories between the working directory and the repository root. Reasoning: the PR documents this as a known gap and the repo is active, but community follow-ups often never land.** - 35%, 6-month horizon, due 2027-04-26. Signpost: A merged PR in davila7/claude-code-templates that removes the nested-.claude/ limitation from the ui/stack-viewer documentation. Source: [Coding agents can spot a stale AGENTS.md and still obey it, so make them report the conflict instead of choosing silently](https://newruntime.com/analysis/coding-agents-can-spot-a-stale-agents-md-and-still-obey-it-so-make-them-report/)
- **Warp will announce at least one named customer or commercial chemistry-service relationship.** - 50%, 6-month horizon, due 2027-04-26. Signpost: A customer or company announcement confirms a service engagement, rather than only an investor or hiring update. Source: [Warp’s real test is whether a US chemistry CRO can beat the status quo](https://newruntime.com/analysis/warp-s-real-test-is-whether-a-us-chemistry-cro-can-beat-the-status-quo/)
- **Replit or Chroma will publish more detail about the intended context-layer integration.** - 65%, 6-month horizon, due 2027-04-26. Signpost: Public product documentation or an announcement explains how Chroma infrastructure connects to Replit agents and identifies at least one concrete capability. Source: [Replit has bought context infrastructure, not yet an enterprise memory product](https://newruntime.com/analysis/replit-has-bought-context-infrastructure-not-yet-an-enterprise-memory-product/)
- **A subsequent published measurement will still show exposed PHP 8.1-or-older deployments after the initial patch window.** - 65%, 6-month horizon, due 2027-04-27. Signpost: A telemetry report identifies publicly visible affected hosts by PHP version and reports remaining systems on unsupported branches. Source: [Exploit timelines now outrun PHP fleet remediation](https://newruntime.com/analysis/exploit-timelines-now-outrun-php-fleet-remediation/)
- **GPT-6.1 Terra is added to the HydraFusion or HydraFusion Max model pool.** - 45%, 6-month horizon, due 2027-04-27. Signpost: A GitHub changelog entry listing GPT-6.1 Terra among HydraFusion's pool models. Source: [Terra's lower list price doesn't tell you what Copilot will cost you](https://newruntime.com/analysis/terra-s-lower-list-price-doesn-t-tell-you-what-copilot-will-cost-you/)
- **Exploitability reporting will remain deployment-specific rather than establishing one reliable PHP2Shell chain across all affected configurations.** - 65%, 6-month horizon, due 2027-04-27. Signpost: Technical advisories or incident reports distinguish outcomes by PHP deployment mode or configuration rather than reporting uniform success. Source: [PHP2Shell’s headline numbers show exposure, not a universal exploit](https://newruntime.com/analysis/php2shell-s-headline-numbers-show-exposure-not-a-universal-exploit/)
- **SpaceX will provide a public update that clarifies a GPU delivery or operational deployment milestone.** - 60%, 6-month horizon, due 2027-04-27. Signpost: A company statement, filing, or credible report identifies delivered GPUs or an operational deployment tied to this financing. Source: [Callable GPU financing shifts the risk toward utilization](https://newruntime.com/analysis/callable-gpu-financing-shifts-the-risk-toward-utilization/)
- **Cursor publishes explicit per-token rates for third-party models on the unified plan in its Models & Pricing docs.** - 60%, 6-month horizon, due 2027-04-27. Signpost: A Models & Pricing page table listing per-model input/output rates for Claude, GPT or Gemini under the X Subscription. Source: [If you use Claude or GPT in Cursor, do the X Subscription math before you take a switch you can't undo](https://newruntime.com/analysis/if-you-use-claude-or-gpt-in-cursor-do-the-x-subscription-math-before-you-take-a/)
- **Cognition publicly names which frontier models besides Claude Mythos power Devin Security scans, in docs or a follow-up post. The probability sits near even because vendors often keep model lists vague to preserve flexibility.** - 45%, 6-month horizon, due 2027-04-27. Signpost: A Devin docs page or Cognition blog post listing specific model names for Security scans. Source: [Cognition's security launch looks like a bid to own the enterprise security relationship, using Anthropic's model as the draw](https://newruntime.com/analysis/cognition-s-security-launch-looks-like-a-bid-to-own-the-enterprise-security/)
- **Cognition or a named enterprise customer publishes a Devin Security remediation metric (PR merge rate, time-to-fix for critical findings, or false-positive rate) attributed to a specific organization. The probability is near even because case studies usually follow large credit programs, but named numbers are less common.** - 45%, 6-month horizon, due 2027-04-27. Signpost: A Cognition case study or customer engineering blog citing specific merge or time-to-remediate figures for Devin Security PRs. Source: [Cognition's security launch looks like a bid to own the enterprise security relationship, using Anthropic's model as the draw](https://newruntime.com/analysis/cognition-s-security-launch-looks-like-a-bid-to-own-the-enterprise-security/)
- **An independent party publishes a run of Entire's open-source push benchmark against GitHub and reports at least a 10x advantage. Rationale: the benchmark is open, so running it is cheap, but vendor 'up to' figures rarely hold at full size once someone else runs them.** - 25%, 6-month horizon, due 2027-04-27. Signpost: A third-party blog post or repo with disclosed methodology and results comparing Entire and GitHub push times. Source: [Agent merge gates are probabilistic, so the job that matters is measuring how often they are wrong](https://newruntime.com/analysis/agent-merge-gates-are-probabilistic-so-the-job-that-matters-is-measuring-how/)
- **GitHub makes GPT-6.1 Terra the default or auto-selected model on at least one Copilot surface (cloud agent, CLI or auto model selection).** - 35%, 6-month horizon, due 2027-04-27. Signpost: A GitHub changelog entry naming Terra as the default or auto-mode model for a Copilot surface. Source: [GPT-6.1 Terra is switched on in Copilot unless an admin opted out, so your model policy matters more than its price](https://newruntime.com/analysis/gpt-6-1-terra-is-switched-on-in-copilot-unless-an-admin-opted-out-so-your-model/)
- **An independent evaluation publishes a Terminal-Bench 4.0 result for GPT-6.1 Terra at maximum effort that is more than 5 percentage points below OpenAI's reported 50.3%.** - 35%, 6-month horizon, due 2027-04-27. Signpost: A public leaderboard or third-party eval post listing Terra on Terminal-Bench 4.0 with harness details and a score under 45.3%. Source: [GPT-6.1 Terra is switched on in Copilot unless an admin opted out, so your model policy matters more than its price](https://newruntime.com/analysis/gpt-6-1-terra-is-switched-on-in-copilot-unless-an-admin-opted-out-so-your-model/)
- **Third-party integrations with LiveKit or Twilio will see limited adoption (under 20%) for Gemini Live Avatar in customer support bots within 12 months, as enterprises prioritize testing user fatigue before scaling.** - 50%, 12-month horizon, due 2027-09-26. Signpost: Public case studies or developer forums showing enterprises hesitant to deploy Gemini Live Avatar without custom UX safeguards for continuous speech. Source: [Gemini Live Avatar turns enterprise AI support into a 24/7 visual hostage situation](https://newruntime.com/analysis/gemini-live-avatar-turns-enterprise-ai-support-into-a-24-7-visual-hostage/)
- **At least one enterprise will publish a post-mortem detailing how Gemini Live Avatar’s continuous speech worsened user frustration during a tool call timeout, leading to a redesign of fallback dialogue.** - 30%, 12-month horizon, due 2027-09-26. Signpost: A conference talk or internal blog from a Fortune 500 company describing how they mitigated user fatigue by introducing brief pauses in the avatar’s speech during delays. Source: [Gemini Live Avatar turns enterprise AI support into a 24/7 visual hostage situation](https://newruntime.com/analysis/gemini-live-avatar-turns-enterprise-ai-support-into-a-24-7-visual-hostage/)
- **The RoboLab‑120 leaderboard will receive at least three new entries that cite FLUX 3 Action as a baseline before the competition deadline in 12 months.** - 45%, 12-month horizon, due 2027-09-26. Signpost: Updated leaderboard showing new submissions with "flux-3-action" in their model name. Source: [Fast world‑action models will push robot control onto the edge](https://newruntime.com/analysis/fast-world-action-models-will-push-robot-control-onto-the-edge/)
- **Early plugin teams will maintain an independent GitHub distribution path alongside their Anthropic directory listing.** - 70%, 12-month horizon, due 2027-09-26. Signpost: Directory-listed plugins increasingly link to versioned repositories or documented installation paths outside the portal. Source: [Claude plugins now depend on Anthropic’s distribution rules](https://newruntime.com/analysis/claude-plugins-now-depend-on-anthropic-s-distribution-rules/)
- **Microsoft’s Copilot Home usage‑metered revenue will show double‑digit YoY growth in the next 12 months, indicating increasing enterprise adoption.** - 68%, 12-month horizon, due 2027-09-27. Signpost: Microsoft 365 earnings report shows >20% YoY increase in Copilot usage‑metered revenue and a growing number of Fortune 500 customers enrolling in Managed Runtime. Source: [Microsoft’s Copilot Home reshapes the enterprise AI platform landscape](https://newruntime.com/analysis/microsoft-s-copilot-home-reshapes-the-enterprise-ai-platform-landscape/)
- **Within 12 months, follow-up work will focus more on equal-compute transfer baselines than on zero-data demonstrations, because external benchmark performance is the unresolved test of the method.** - 75%, 12-month horizon, due 2027-09-27. Signpost: New papers report conventional-data and synthetic-data baselines with matched compute, plus held-out natural-data evaluations. Source: [Zero-data self-play could move pretraining spend from corpora to curriculum search](https://newruntime.com/analysis/zero-data-self-play-could-move-pretraining-spend-from-corpora-to-curriculum/)
- **Open-source inference servers like vLLM and Triton will release query-plan hooks within 12 months, reducing the barrier to entry for enterprises.** - 60%, 12-month horizon, due 2027-09-28. Signpost: A vLLM or Triton GitHub release notes a new ‘SQL-plan aware scheduler’ module with benchmark results. Source: [Quail proves AI-SQL workloads need a new kind of inference engine](https://newruntime.com/analysis/quail-proves-ai-sql-workloads-need-a-new-kind-of-inference-engine/)
- **Enterprises will report 3x–5x reductions in per-query GPU costs for AI-SQL workloads after adopting query-aware inference, based on independent benchmarks.** - 50%, 12-month horizon, due 2027-09-28. Signpost: Case studies from Fortune 500 firms published in post-mortem blogs or conferences, showing cost metrics for AI-SQL pipelines before/after Quail-like optimizations. Source: [Quail proves AI-SQL workloads need a new kind of inference engine](https://newruntime.com/analysis/quail-proves-ai-sql-workloads-need-a-new-kind-of-inference-engine/)
- **Within 12 months, a high-profile security incident involving an autonomous coding agent will be disclosed, prompting regulatory guidance on AI-agent permissions and sandboxing standards.** - 40%, 12-month horizon, due 2027-09-28. Signpost: A public breach report from a major software firm (e.g., a Fortune 500 company) citing agent-generated code as the attack vector, followed by regulatory statements or guidelines on AI-agent containment. Source: [Claude Opus 4.5 and GPT-5.1 Cross the Reliability Threshold: What Developers Must Do Next](https://newruntime.com/analysis/claude-opus-4-5-and-gpt-5-1-cross-the-reliability-threshold-what-developers/)
- **At least three major AI platforms will expose a unified budgeting API that reports per‑run compute cost to finance teams.** - 65%, 12-month horizon, due 2027-09-28. Signpost: Public SDK documentation update on Anthropic, OpenAI, or Azure showing a new endpoint "/v1/budget/usage" with per‑run cost fields. Source: [Task‑based pricing forces AI work from token consumption to runtime‑orchestrated, verified agent loops](https://newruntime.com/analysis/metadox-task-based-pricing-forces-ai-work-from-token-consumption-to-runtime/)
- **Within the next 12 months, 30% of AI‑agent pilots launched in 2024‑2025 will be terminated due to insufficient governance controls** - 62%, 12-month horizon, due 2027-09-28. Signpost: Post‑mortem blog posts or internal survey summaries citing “lack of clear escalation path” as the primary reason for shutdown, consistent with the hidden‑constraint findings of the Google field trial Source: [Proactive AI teammates stumble on the invisible bottleneck of relational trust](https://newruntime.com/analysis/proactive-ai-teammates-stumble-on-the-invisible-bottleneck-of-relational-trust/)
- **Open‑source frameworks such as ACI.dev will see a 40% increase in enterprise adoption for permission‑aware agent tooling by mid‑2027** - 55%, 12-month horizon, due 2027-09-28. Signpost: GitHub activity spikes (stars, forks) and case‑study announcements referencing ACI.dev as the backbone for multi‑tenant, intent‑aware agent permissions Source: [Proactive AI teammates stumble on the invisible bottleneck of relational trust](https://newruntime.com/analysis/proactive-ai-teammates-stumble-on-the-invisible-bottleneck-of-relational-trust/)
- **At least one independent evaluation of Manus 2.0 will assess a workflow beyond the single configuration comparison cited by Manus, making reliability or end-to-end cost a visible point of comparison.** - 40%, 12-month horizon, due 2027-09-29. Signpost: A third-party benchmark or published user study reports repeatable task outcomes, intervention needs, or full workflow costs for Manus 2.0. Source: [Manus’s Efficiency Gains Are a Harness Result, Not an Agent Verdict](https://newruntime.com/analysis/manus-s-efficiency-gains-are-a-harness-result-not-an-agent-verdict/)
- **OpenAI will not lower GPT-4o mini pricing in response to Sonnet 5.5, as its $0.15/$0.60 per million token model remains competitively priced for ultra-low-cost use cases.** - 60%, 12-month horizon, due 2027-09-29. Signpost: No pricing updates or blog posts from OpenAI addressing Sonnet 5.5’s launch within the next year. Source: [Anthropic’s Sonnet 5.5: 30% faster, 30% cheaper—but only for tightly scoped tasks](https://newruntime.com/analysis/anthropic-s-sonnet-5-5-30-faster-30-cheaper-but-only-for-tightly-scoped-tasks/)
- **Within 12 months, 40% of teams using FireRouter will implement task-level routing rules (e.g., 'only route syntax tasks; block routing for refactoring') to mitigate accuracy loss.** - 60%, 12-month horizon, due 2027-09-29. Signpost: Public case studies or vendor dashboards show segmented routing adoption, with teams explicitly categorizing tasks by routing eligibility and tracking downstream metrics (e.g., retry rates, correction time). Source: [FireRouter’s cost savings hide a hidden accuracy tax on coding tasks](https://newruntime.com/analysis/firerouter-s-cost-savings-hide-a-hidden-accuracy-tax-on-coding-tasks/)
- **Within twelve months Meta will extend Muse’s approval‑gate model to a messaging surface (WhatsApp or Messenger), allowing owners to approve a draft reply before it is sent.** - 55%, 12-month horizon, due 2027-09-30. Signpost: An announcement or product demo that shows Muse preparing a customer‑service message and pausing for owner approval within a Meta messaging app. Source: [Muse’s real test is whether small businesses trust it with the next click](https://newruntime.com/analysis/muse-s-real-test-is-whether-small-businesses-trust-it-with-the-next-click/)
- **We expect persistent-agent evaluations to include permission scope and interruptibility alongside task completion.** - 55%, 12-month horizon, due 2027-09-30. Signpost: A published evaluation or buyer checklist that measures authorization boundaries or human approval alongside task outcomes. Source: [Dots makes permission design part of the agent, not an afterthought](https://newruntime.com/analysis/dots-makes-permission-design-part-of-the-agent-not-an-afterthought/)
- **Anthropic will announce Claude Sonnet 5.5 with a 1 M‑token window and reduced per‑token pricing, prompting OpenAI to adjust Sol’s rates within twelve months** - 40%, 12-month horizon, due 2027-09-30. Signpost: Official Anthropic blog or pricing page updates announcing Sonnet 5.5 with the specified capabilities. Source: [Long‑context coding agents will reshape how we build AI‑driven development pipelines](https://newruntime.com/analysis/long-context-coding-agents-will-reshape-how-we-build-ai-driven-development/)
- **Google or a program participant will publicly describe a concrete Fairwind use outcome, though the report may not amount to an independent safety assessment.** - 40%, 12-month horizon, due 2027-10-01. Signpost: A public report identifies a specific defender workflow result or verified outcome from Fairwind. Source: [Argon’s million-token ceiling still needs a coding test](https://newruntime.com/analysis/argon-s-million-token-ceiling-still-needs-a-coding-test/)
- **At least one public discussion of AI’s effect on entry-level work will cite junior hiring or headcount separately from aggregate employment.** - 65%, 12-month horizon, due 2027-10-01. Signpost: A report or employer disclosure compares entry-level hiring or headcount with overall employment in an AI-adopting organization or sector. Source: [A falling junior share does not prove junior jobs are disappearing](https://newruntime.com/analysis/a-falling-junior-share-does-not-prove-junior-jobs-are-disappearing/)
- **Public discussion of Pi Durable will surface concrete questions or reports about state recovery and human steering, beyond its stated use cases.** - 55%, 12-month horizon, due 2027-10-02. Signpost: A public issue, deployment write-up, or documentation update describes an interrupted run and what users can inspect or recover. Source: [Pi is splitting tool complexity from agent persistence](https://newruntime.com/analysis/pi-is-splitting-tool-complexity-from-agent-persistence/)
- **Teams prototyping with streaming transcription will add an explicit stability or confirmation gate before at least some consequential tool calls.** - 60%, 12-month horizon, due 2027-10-03. Signpost: A public implementation guide, sample, or product configuration documents a gate that delays or confirms actions when transcript content is still changing. Source: [Fast partial transcripts make action control the real voice-agent test](https://newruntime.com/analysis/fast-partial-transcripts-make-action-control-the-real-voice-agent-test/)
- **At least one independent group will publish an AI-assisted theoretical-physics calculation with an explicit account of validation and human effort.** - 45%, 12-month horizon, due 2027-10-03. Signpost: A group outside Anthropic publishes a comparable workflow, identifying its target, checks and expert review or correction time. Source: [The physics speedup depends on a result experts can check](https://newruntime.com/analysis/the-physics-speedup-depends-on-a-result-experts-can-check/)
- **At least one major developer platform will announce or expand remote supervision for coding-agent sessions.** - 65%, 12-month horizon, due 2027-10-04. Signpost: A product announcement or documentation update adds remote monitoring or steering for coding-agent work. Source: [T3 Code keeps the agent local; Cursor moves it to managed workers](https://newruntime.com/analysis/t3-code-keeps-the-agent-local-cursor-moves-it-to-managed-workers/)
- **If AgentCraft attracts use beyond demonstration, its project documentation or releases will describe at least one concrete change to how users inspect worker state, questions or merge decisions.** - 45%, 12-month horizon, due 2027-10-04. Signpost: A public release or repository update adds documented supervision functionality beyond the currently described activity inspection and approval flow. Source: [AgentCraft’s real test is whether reviewers catch more mistakes](https://newruntime.com/analysis/agentcraft-s-real-test-is-whether-reviewers-catch-more-mistakes/)
- **Public evaluation of Cloudflare OS will focus on the safety of mediated access and deferred side effects, not only on app-building features.** - 55%, 12-month horizon, due 2027-10-04. Signpost: A public assessment or documented test suite reports on Gatekeeper controls, action logs, or simulated-versus-real outcomes. Source: [Cloudflare OS treats agent permissions as a product problem](https://newruntime.com/analysis/cloudflare-os-treats-agent-permissions-as-a-product-problem/)
- **The project’s published results will continue to show uneven coverage across categories rather than a uniformly high result across DOM and CSS areas.** - 70%, 12-month horizon, due 2027-10-05. Signpost: A later per-area results report still shows a material gap between at least one DOM category and Grid or Flexbox. Source: [Northstar’s DOM strength runs ahead of its CSS readiness](https://newruntime.com/analysis/northstar-s-dom-strength-runs-ahead-of-its-css-readiness/)
- **Within 12 months, at least one federal agency will publicly identify a follow-up step tied to the report, if it contains specific recommendations.** - 45%, 12-month horizon, due 2027-10-05. Signpost: An agency announcement or formal document cites the report and names an action, responsible office or implementation timeline. Source: [The task force’s restraint clause may define its security agenda](https://newruntime.com/analysis/the-task-force-s-restraint-clause-may-define-its-security-agenda/)
- **Within 12 months, at least two public agent evaluation or deployment writeups will report testing direct access or proxy-bypass paths as a distinct part of their runtime evaluation.** - 45%, 12-month horizon, due 2027-10-05. Signpost: Look for writeups that name bypass or direct-egress tests and report a result; this is a low-confidence forecast because current items raise the concern but do not establish adoption. Source: [Reusable agents spread faster than trust does](https://newruntime.com/analysis/metadox-reusable-agents-spread-faster-than-trust-does/)
- **A major AI provider will publicly clarify its policies for human review or law-enforcement disclosure in response to scrutiny of chatbot threat reporting.** - 40%, 12-month horizon, due 2027-10-06. Signpost: A policy revision, transparency report, or public statement specifically clarifies review or referral practices. Source: [One arrest does not establish a company-wide escalation rule](https://newruntime.com/analysis/one-arrest-does-not-establish-a-company-wide-escalation-rule/)
- **A public discussion of scaling an agent workload will identify deployment, workload allocation, utilization or serving assumptions as material to interpreting nominal capacity.** - 60%, 12-month horizon, due 2027-10-06. Signpost: A company report or technical publication explicitly distinguishes available inference capacity from the share actually deployed or used for agent tasks. Source: [Agent capacity is easier to project than agent demand](https://newruntime.com/analysis/agent-capacity-is-easier-to-project-than-agent-demand/)
- **Unbiased will continue listing the 26.10 rates or publish a replacement pricing schedule within a year.** - 60%, 12-month horizon, due 2027-10-06. Signpost: A public pricing page, model card, or changelog records the existing rates or a dated successor schedule. Source: [Pareto’s lower rates are a test of cost per successful task, not a cheaper bill by default](https://newruntime.com/analysis/pareto-s-lower-rates-are-a-test-of-cost-per-successful-task-not-a-cheaper-bill/)
- **An external evaluation of Flow will publish a failure or recovery test involving state and queue progress rather than relying only on throughput claims.** - 55%, 12-month horizon, due 2027-10-07. Signpost: A non-Yandex user publishes a test, issue or deployment report showing behavior after an injected failure. Source: [Flow’s exactly-once promise ends at the connector boundary](https://newruntime.com/analysis/flow-s-exactly-once-promise-ends-at-the-connector-boundary/)
- **At least one public account of Large 4 deployment will specify operational requirements beyond the model’s parameter count.** - 55%, 12-month horizon, due 2027-10-07. Signpost: A deployment guide or customer report documents hardware, licensing, or governance requirements for running the weights. Source: [Large 4’s sovereignty case depends on weights, not the preview](https://newruntime.com/analysis/large-4-s-sovereignty-case-depends-on-weights-not-the-preview/)
- **If organizations expand use beyond low-risk tasks, they will seek evidence that edits can be checked and traced, not just created in place.** - 60%, 12-month horizon, due 2027-10-08. Signpost: An enterprise deployment report or product update describes validation practices or audit requirements for AI-made file changes. Source: [Claude’s real test is whether edits beat copy-and-paste](https://newruntime.com/analysis/claude-s-real-test-is-whether-edits-beat-copy-and-paste/)
- **At least one publicly described enterprise pilot will position Dashboards as exploratory analysis alongside existing reporting, rather than as the authoritative reporting layer.** - 60%, 12-month horizon, due 2027-10-09. Signpost: A customer account or case study explicitly describes analyst validation or comparison with an existing trusted report. Source: [Claude can write the SQL, but teams still own the metric](https://newruntime.com/analysis/claude-can-write-the-sql-but-teams-still-own-the-metric/)
- **A public U.S. court or Justice Department development will address another bot-driven streaming or royalty-fraud case.** - 35%, 12-month horizon, due 2027-10-09. Signpost: A DOJ announcement or court filing identifies artificial streaming as part of a music royalty-fraud matter. Source: [AI scaled the fraud; the bots still made the money](https://newruntime.com/analysis/ai-scaled-the-fraud-the-bots-still-made-the-money/)
- **At least one public enterprise deployment will describe a bounded workflow using Gemini Agent or the associated Gemini Enterprise platform, rather than only a keynote demonstration.** - 55%, 12-month horizon, due 2027-10-10. Signpost: A named customer case study reports a deployed workflow and specifies the human review or governance process. Source: [Google is selling the work harness, not a winning model](https://newruntime.com/analysis/google-is-selling-the-work-harness-not-a-winning-model/)
- **At least one follow-up evaluation will distinguish step-level stopping cost from full-pipeline cost, because Milvus’s estimate excludes retrieval and answer generation.** - 60%, 12-month horizon, due 2027-10-11. Signpost: A public evaluation reports both stopping-component cost and total retrieval-plus-answering cost for the same workload. Source: [Jev’s Search-Stop Win Belongs to One Step, Not the Whole Pipeline](https://newruntime.com/analysis/jev-s-search-stop-win-belongs-to-one-step-not-the-whole-pipeline/)
- **A public robotics-data evaluation will compare human-captured demonstrations with robot-native or controlled data using a defined task outcome.** - 60%, 12-month horizon, due 2027-10-11. Signpost: A paper, benchmark or provider report publishes matched evaluation conditions and task-level results across at least two collection approaches. Source: [Compare human demonstrations with robot data before buying scale](https://newruntime.com/analysis/compare-human-demonstrations-with-robot-data-before-buying-scale/)
- **At least one further public evaluation will report per-task or per-constraint outcomes for verification-led research, rather than only an aggregate score.** - 60%, 12-month horizon, due 2027-10-12. Signpost: A paper or reproducible report publishes constraint-level accuracy or audit-specific ablations. Source: [AREX’s benchmark gains need a component-by-component test](https://newruntime.com/analysis/arex-s-benchmark-gains-need-a-component-by-component-test/)
- **At least one public analysis of a specialist compute provider will identify customer concentration as a material risk to financing or expansion.** - 55%, 12-month horizon, due 2027-10-12. Signpost: A financing disclosure, investor report or company commentary explicitly discusses dependence on a small number of customers in connection with funding or growth. Source: [AI capacity is only valuable when tenants keep it busy](https://newruntime.com/analysis/ai-capacity-is-only-valuable-when-tenants-keep-it-busy/)
- **Within 12 months, at least one later Northstar per-area results report will continue to show materially lower Grid or Flexbox performance than at least one DOM category; otherwise this forecast fails.** - 65%, 12-month horizon, due 2027-10-12. Signpost: A later Northstar results report publishes per-area scores showing a gap between Grid or Flexbox and a DOM category. Source: [AI systems gain reach by surrendering the shortcut of trusting completion](https://newruntime.com/analysis/metadox-ai-systems-gain-reach-by-surrendering-the-shortcut-of-trusting-completion/)
- **At least one public deployment account will identify memory carryover or repeated actions as an issue that needs a workflow safeguard.** - 55%, 12-month horizon, due 2027-10-13. Signpost: By October 12, 2027, a developer case study or incident report documents a stale-memory or duplicate-action failure and a mitigation. Source: [Test what an agent keeps before trusting what it can finish](https://newruntime.com/analysis/test-what-an-agent-keeps-before-trusting-what-it-can-finish/)
- **At least one follow-up evaluation will test workflow-training results with an external or independently defined evaluation signal, rather than relying only on the model’s own selection process.** - 60%, 12-month horizon, due 2027-10-13. Signpost: A public report explicitly describes held-out grading or independently verifiable outcomes for trace-trained workflows. Source: [MASS’s gains belong to specific tasks, not self-improvement in general](https://newruntime.com/analysis/mass-s-gains-belong-to-specific-tasks-not-self-improvement-in-general/)
- **At least one independent assessment will examine Argon’s cyber-safety behavior beyond Google’s own reported testing.** - 55%, 12-month horizon, due 2027-10-14. Signpost: A third-party security evaluation publishes a defined test of Argon’s cyber capabilities or safeguards and reports methodology and results. Source: [Argon’s wider launch tests whether safety gates can scale](https://newruntime.com/analysis/argon-s-wider-launch-tests-whether-safety-gates-can-scale/)
- **Modal-specific public evidence will not yet establish sandbox segment margins or customer concentration within a year.** - 65%, 12-month horizon, due 2027-10-15. Signpost: Subsequent disclosures repeat overall revenue or usage metrics without providing sandbox-level profitability or customer concentration. Source: [Sandbox launches matter only when they become repeat paid work](https://newruntime.com/analysis/sandbox-launches-matter-only-when-they-become-repeat-paid-work/)
- **Within twelve months, public results will not establish a sustained recovery in Bumble App paying users attributable to AI or offline experiments.** - 65%, 12-month horizon, due 2027-10-15. Signpost: A filing or results release reports Bumble App paying users but does not connect a sustained improvement to those experiments. Source: [Bumble must make successful dates pay, not just more swipes](https://newruntime.com/analysis/bumble-must-make-successful-dates-pay-not-just-more-swipes/)
- **The agreed acquisition will be reported as completed within twelve months.** - 75%, 12-month horizon, due 2027-10-15. Signpost: A Bumble or Ithaca announcement, or a filing, confirms closing. Source: [Bumble must make successful dates pay, not just more swipes](https://newruntime.com/analysis/bumble-must-make-successful-dates-pay-not-just-more-swipes/)
- **Public evidence will remain insufficient to determine whether the bundle improves retention unless usage or migration is reported separately.** - 70%, 12-month horizon, due 2027-10-15. Signpost: Coverage cites bundle availability or aggregate subscribers but provides no separate migration, retention or cross-product usage figures. Source: [A shared weekly pool turns Cursor and Grok into a trade-off](https://newruntime.com/analysis/a-shared-weekly-pool-turns-cursor-and-grok-into-a-trade-off/)
- **Public Salience materials will still not provide an independent, workload-level comparison against an established fabric.** - 65%, 12-month horizon, due 2027-10-16. Signpost: By then, public technical materials lack a third-party or customer report comparing end-to-end workload performance, network power and reliability under stated conditions. Source: [Salience must prove its switch improves the whole fabric](https://newruntime.com/analysis/salience-must-prove-its-switch-improves-the-whole-fabric/)
- **Vercel will publish a change to Token Pass pricing, included credit, or eligible models within a year.** - 40%, 12-month horizon, due 2027-10-16. Signpost: Updated public subscription terms or an announcement changes the fee, credit allowance, or roster. Source: [Token Pass only saves money if teams use its narrow model allowance](https://newruntime.com/analysis/token-pass-only-saves-money-if-teams-use-its-narrow-model-allowance/)
- **Public material will clarify at least one handling step for a disputed or noncompliant Verified-bot finding, without necessarily establishing a formal appeal process.** - 45%, 12-month horizon, due 2027-10-18. Signpost: Cloudflare documentation specifies a review, correction, status, or access consequence tied to a finding. Source: [A bot flag matters only if publishers can inspect and challenge it](https://newruntime.com/analysis/a-bot-flag-matters-only-if-publishers-can-inspect-and-challenge-it/)
- **Public evidence of production adoption will remain weaker than evidence of trials unless teams publish operational results that include memory and cost constraints.** - 55%, 12-month horizon, due 2027-10-18. Signpost: Public case studies or deployment reports either document ongoing production use and serving costs or show that coverage remains limited to recipes and benchmarks. Source: [Ling’s 25B-active label does not make it a small model to serve](https://newruntime.com/analysis/ling-s-25b-active-label-does-not-make-it-a-small-model-to-serve/)
- **A follow-up about the rebuilt services will document at least one concrete compatibility or reliability check.** - 40%, 12-month horizon, due 2027-10-18. Signpost: A release note, project document or published account names a test, incident, user disruption or rollback outcome tied to the rewrite. Source: [A stable interface made webmention.io’s Ruby-to-PHP rewrite viable](https://newruntime.com/analysis/a-stable-interface-made-webmention-io-s-ruby-to-php-rewrite-viable/)
- **A public agent deployment or safety evaluation will report workflow-specific limits or failure cases alongside a broad-access release or rollout.** - 50%, 12-month horizon, due 2027-10-19. Signpost: A deployment report names tested workflows and documents constraints, exclusions, or observed failures rather than relying only on a general safety assertion. Source: [Delegation moves forward when outcomes—not every action—are reviewable](https://newruntime.com/analysis/metadox-delegation-moves-forward-when-outcomes-not-every-action-are-reviewable/)
- **Public asynchronous-RL run reports will increasingly pair drift diagnostics with task outcomes rather than present stability as a task score alone.** - 60%, 12-month horizon, due 2027-10-20. Signpost: New training traces or experiment reports show mismatch or masked-token diagnostics alongside performance results. Source: [IPO makes asynchronous RL drift a measurable design choice](https://newruntime.com/analysis/ipo-makes-asynchronous-rl-drift-a-measurable-design-choice/)
- **At least one other major model or cloud vendor, besides TypeSafe and Cloudflare, ships a non-generative, schema-bound extraction or decision model that returns per-field confidence.** - 45%, 12-month horizon, due 2027-10-20. Signpost: A launch post from a large provider describing a typed, non-autoregressive model with confidence outputs, under 'System One' or similar language. Source: [With Clairic, extraction work shifts from fixing broken JSON to setting confidence thresholds](https://newruntime.com/analysis/with-clairic-extraction-work-shifts-from-fixing-broken-json-to-setting/)
- **At least one named bank, insurer or government agency publicly credits an OpenAI model for a production COBOL migration.** - 30%, 12-month horizon, due 2027-10-20. Signpost: A customer case study or joint press release naming the institution, the scope of the migrated system and how the result was validated. Source: [If OpenAI's COBOL gains hold up, the money in legacy modernization moves from rewriting code to proving the new code behaves like the old](https://newruntime.com/analysis/if-openai-s-cobol-gains-hold-up-the-money-in-legacy-modernization-moves-from/)
- **A named enterprise in a regulated European sector (health, insurance, banking, public services) will publicly report a production Voxtral 3 voice-agent deployment with at least one quantified outcome.** - 35%, 12-month horizon, due 2027-10-21. Signpost: A Mistral case study or customer press release that names the organization and gives a call-resolution, containment or handling-time figure for a Voxtral 3 agent. Reasoning: regulated deployments move slowly, and quantified public case studies are rarer than logo announcements, so we put this below even odds. Source: [Voxtral 3's EU-hosted voice agent may not stay in the EU: Mistral's own docs leave the agent layer open](https://newruntime.com/analysis/voxtral-3-s-eu-hosted-voice-agent-may-not-stay-in-the-eu-mistral-s-own-docs/)
- **A buyer evaluating Eka will publish or describe a trial using its own objects and a stated successful-picks-per-hour measure.** - 40%, 12-month horizon, due 2027-10-21. Signpost: A named deployment account gives results from a customer-specific comparison with defined success criteria. Source: [Eka’s 2.5× picking claim needs a named baseline](https://newruntime.com/analysis/eka-s-2-5-picking-claim-needs-a-named-baseline/)
- **OpenAI, Anthropic or Google includes a multi-user collaboration benchmark (CooperBench, Collaborative Intelligence or similar) in an official model release.** - 30%, 12-month horizon, due 2027-10-21. Signpost: A frontier launch post or model card with a cooperative or multi-user results table. Source: [Humans& claims 39% on CooperBench, a benchmark that has no public Ampersand entry, and admits the model over-coaches. Our read: v0.1 is a bid to set the scoring rule for collaboration.](https://newruntime.com/analysis/humans-claims-39-on-cooperbench-a-benchmark-that-has-no-public-ampersand-entry/)
- **A non-OpenAI group publishes an evaluation of GPT-Rosalind on reproducible life-sciences workflow tasks, with tool use and code disclosed.** - 55%, 12-month horizon, due 2027-10-21. Signpost: A bioRxiv or arXiv preprint naming GPT-Rosalind with a released task set and evaluation harness. Source: [GPT-Rosalind's gate comes from a biosecurity threshold, so labs must get version and notice terms before they build on it](https://newruntime.com/analysis/gpt-rosalind-s-gate-comes-from-a-biosecurity-threshold-so-labs-must-get-version/)
- **By 2027-10-21, Linear's developer documentation will no longer label its agent APIs a Developer Preview.** - 45%, 12-month horizon, due 2027-10-21. Signpost: The 'Developer Preview' label disappears from linear.app/developers/agents, or a GA or versioned-stability announcement appears in Linear's changelog. Rationale: the platform has been live since May 2025 (d2) with several integrators, which pushes toward stabilization. Preview labels often stay well beyond a year, though. Source: [Factory's Linear delegation lets anyone who can file an issue borrow the org's Git credentials](https://newruntime.com/analysis/factory-s-linear-delegation-lets-anyone-who-can-file-an-issue-borrow-the-org-s/)
- **At least one public follow-up will test a released binder for functional activity beyond binding.** - 45%, 12-month horizon, due 2027-10-21. Signpost: A paper, preprint, or lab report identifies a released sequence and reports neutralization or another relevant functional assay. Source: [Claude’s scorpion-toxin binders remain one-toxin-at-a-time](https://newruntime.com/analysis/claude-s-scorpion-toxin-binders-remain-one-toxin-at-a-time/)
- **FLUX 3 Max will still be in the top 3 of Artificial Analysis's text-to-video (no audio) leaderboard.** - 35%, 12-month horizon, due 2027-10-21. Signpost: Monthly leaderboard snapshots showing whether new releases push FLUX 3 Max below rank 3. Source: [FLUX 3 Max ties on quality and its speed figures come only from fal, but if they hold, reviewing a clip will take longer than rendering it](https://newruntime.com/analysis/flux-3-max-ties-on-quality-and-its-speed-figures-come-only-from-fal-but-if-they/)
- **Anthropic will report at least one concrete Duet performance measure, such as task completion or user intervention, as the preview develops.** - 40%, 12-month horizon, due 2027-10-22. Signpost: A product update or public report provides a task-success, intervention, or reliability figure. Source: [Claude Duet’s real test is finishing work before it needs you](https://newruntime.com/analysis/claude-duet-s-real-test-is-finishing-work-before-it-needs-you/)
- **A US federal exclusion action (FASC recommendation, Federal Register notice, DoD directive or enacted legislation) names at least one Chinese model developer other than DeepSeek, such as Moonshot (Kimi), Zhipu (GLM) or Alibaba (Qwen).** - 35%, 12-month horizon, due 2027-10-22. Signpost: A new FASC recommendation or Federal Register exclusion notice naming a second Chinese AI model vendor. Source: [The DeepSeek ban names one vendor, while unnamed alternatives sit one setting away in the same gateway](https://newruntime.com/analysis/the-deepseek-ban-names-one-vendor-while-unnamed-alternatives-sit-one-setting/)
- **Within twelve months, at least one public report will identify a measurable gap in patching or mitigation among PHP 8.1-and-earlier deployments.** - 45%, 12-month horizon, due 2027-10-22. Signpost: A provider, maintainer, or researcher publishes a version-specific exposure or remediation assessment covering PHP 8.1 and earlier. Source: [PHP’s leaked disclosure turned patch readiness into the real security test](https://newruntime.com/analysis/php-s-leaked-disclosure-turned-patch-readiness-into-the-real-security-test/)
- **Anthropic will broaden Duet access beyond its initial US Pro and Max waitlist if preview demand and operational performance support it.** - 45%, 12-month horizon, due 2027-10-22. Signpost: An official announcement adds another region or subscription tier to Duet availability. Source: [Claude Duet’s real test is whether delegation earns its place in the quota](https://newruntime.com/analysis/claude-duet-s-real-test-is-whether-delegation-earns-its-place-in-the-quota/)
- **Anthropic announces Duet-specific pricing or a separate background-work allowance instead of fully shared Pro/Max limits.** - 50%, 12-month horizon, due 2027-10-22. Signpost: Pricing page or release notes mention a Duet add-on or Duet-specific usage limits. Source: [Claude Duet is aimed at small-business admin, and its one-model, shared-quota, approval-gated design matters more than its shopping demo](https://newruntime.com/analysis/claude-duet-is-aimed-at-small-business-admin-and-its-one-model-shared-quota/)
- **Cohere publishes Vault or confidential-tier pricing detailed enough to compare with per-token API cost at a stated volume.** - 30%, 12-month horizon, due 2027-10-22. Signpost: Per-instance or per-hour Vault prices appear on cohere.com/pricing or in public documentation, not only through 'contact sales'. Source: [Rerank 5 costs about a tenth of a cent per query, and our bet is that Cohere earns its margin in Vault, not the API](https://newruntime.com/analysis/rerank-5-costs-about-a-tenth-of-a-cent-per-query-and-our-bet-is-that-cohere/)
- **Cohere lowers Rerank 5 API list prices, or adds a cheaper reranker tier, within a year. That would point to open-weight price pressure rather than a deliberate entry-point price.** - 25%, 12-month horizon, due 2027-10-22. Signpost: A Cohere pricing change or new reranker SKU priced below $0.02 per million tokens. Source: [Rerank 5 costs about a tenth of a cent per query, and our bet is that Cohere earns its margin in Vault, not the API](https://newruntime.com/analysis/rerank-5-costs-about-a-tenth-of-a-cent-per-query-and-our-bet-is-that-cohere/)
- **IBM changes the default Granite ensemble recipe (different members or non-equal weighting), or recommends a single model as the default.** - 30%, 12-month horizon, due 2027-10-23. Signpost: A granite-tsfm release or model card that drops equal-weight pooling as the default. Reasoning: IBM's own CRPS figures favour the single member, but vendors rarely walk back a recipe they just launched, so the odds are low. Source: [IBM's own numbers show four forecasters averaged together buy almost nothing, and Timestral's lead still needs a matched harness](https://newruntime.com/analysis/ibm-s-own-numbers-show-four-forecasters-averaged-together-buy-almost-nothing/)
- **Within 12 months, public comparisons of Decisions with general-purpose model calls will include workload-specific quality measures alongside latency.** - 60%, 12-month horizon, due 2027-10-23. Signpost: A reproducible benchmark or technical report specifies a task, test inputs and both decision quality and latency for the compared approaches. Source: [Closed answer sets make model decisions an application design problem](https://newruntime.com/analysis/closed-answer-sets-make-model-decisions-an-application-design-problem/)
- **A public disclosure (CVE, vendor bulletin or academic paper) describes a weakness in NVIDIA GPU confidential mode or in a CPU TEE used for confidential GPU VMs that forces an attestation-policy or firmware change for deployed confidential inference.** - 35%, 12-month horizon, due 2027-10-23. Signpost: An NVIDIA, AMD, Intel or Azure security bulletin referencing confidential GPU/VM attestation, followed by updated required measurements. Source: [Cohere's confidential inference moves trust from the model vendor to two hardware anchors, and nobody has said whether you can verify without them](https://newruntime.com/analysis/cohere-s-confidential-inference-moves-trust-from-the-model-vendor-to-two/)
- **Claude Duet opens to Team or Enterprise plans, or Claude Platform exposes background agent execution with approval gates.** - 45%, 12-month horizon, due 2027-10-23. Signpost: The Help Center removes the 'Team and Enterprise not supported' line, or Managed Agents documentation describes scheduled or background runs with approval gates. Source: [On Google Cloud, Anthropic's agent features now come through Anthropic's own service, billed through Google](https://newruntime.com/analysis/on-google-cloud-anthropic-s-agent-features-now-come-through-anthropic-s-own/)
- **Cohere announces Model Vault confidential computing on NVIDIA Confidential Bare Metal or Blackwell-class hardware.** - 45%, 12-month horizon, due 2027-10-23. Signpost: A Cohere announcement or docs update naming GB200/GB300 or a Bare Metal target for encrypted vaults. NVIDIA's post already says Cohere plans this integration, but hardware rollouts often slip past a year. Source: [Attested inference stops the vendor reading your prompts, not the vendor cutting you off, and both sovereignty routes run on NVIDIA's root of trust](https://newruntime.com/analysis/attested-inference-stops-the-vendor-reading-your-prompts-not-the-vendor-cutting/)
- **Cohere publishes or links to a named third-party security assessment of the Model Vault attestation and OHTTP design.** - 30%, 12-month horizon, due 2027-10-23. Signpost: A report from a named security firm, or a Cohere post linking to an external review. Probability is low because neither announcement mentions any planned audit. Source: [Attested inference stops the vendor reading your prompts, not the vendor cutting you off, and both sovereignty routes run on NVIDIA's root of trust](https://newruntime.com/analysis/attested-inference-stops-the-vendor-reading-your-prompts-not-the-vendor-cutting/)
- **OpenAI publishes a second independent, third-party assessment of its agent monitoring or safeguards, covering either the post-July system or a partner channel.** - 40%, 12-month horizon, due 2027-10-23. Signpost: A report from METR, Redwood or another outside group evaluating OpenAI's changes after July 2026 or safeguards on a reseller or cloud channel. Source: [If OpenAI is following Microsoft's enterprise path, its security story will live in contracts rather than on patch days](https://newruntime.com/analysis/if-openai-is-following-microsoft-s-enterprise-path-its-security-story-will-live/)
- **Uber or OpenAI will publish at least one quantitative adoption or usage metric for the 30,000-employee ChatGPT Work rollout.** - 60%, 12-month horizon, due 2027-10-24. Signpost: An OpenAI customer story or Uber post giving active-user share or task counts. The companies have said they will share adoption and outcome information, but such promises often turn into qualitative case studies. Source: [Pro 200 loses its usage-per-dollar edge over Plus, and Pro 500 sells speed rather than cheaper compute](https://newruntime.com/analysis/pro-200-loses-its-usage-per-dollar-edge-over-plus-and-pro-500-sells-speed/)
- **By 2027-10-31, Anthropic's documentation for the Anthropic-managed Google Cloud route will list an endpoint other than US and Global (for example an EU region).** - 30%, 12-month horizon, due 2027-10-24. Signpost: A new regional endpoint or data-residency wording on the d2 documentation page. Reason the probability is low: the announcement explicitly sends strict-residency customers to the Google-managed route, which suggests no regional endpoint is planned soon. Source: [On Google Cloud, Google's lock-in tools now come only with the slower Claude route](https://newruntime.com/analysis/on-google-cloud-google-s-lock-in-tools-now-come-only-with-the-slower-claude/)
- **Anthropic lists Efficient mode or pooled group budgets as available on a plan other than Enterprise.** - 40%, 12-month horizon, due 2027-10-24. Signpost: Anthropic's pricing page or help center naming Efficient mode or pooled monthly group budgets for Team or another non-Enterprise plan. Source: [Sonnet 5.5's 30% discount is Anthropic's per-token claim; your job now is proving it per task through a policy layer](https://newruntime.com/analysis/sonnet-5-5-s-30-discount-is-anthropic-s-per-token-claim-your-job-now-is-proving/)
- **A security researcher or press report will describe content crossing a permission boundary through a ChatGPT Space, a Team Task or a @ChatGPT reply in Slack or Teams.** - 35%, 12-month horizon, due 2027-10-24. Signpost: A published write-up showing a user obtaining Space or connector data through a triggered task or channel mention that they could not access directly. Source: [Once ChatGPT agents run under a team account, who can trigger them matters as much as what they can read](https://newruntime.com/analysis/once-chatgpt-agents-run-under-a-team-account-who-can-trigger-them-matters-as/)
- **Moonshot will either make the promised K3.1 Pro weights available by its stated target or publicly revise the target.** - 60%, 12-month horizon, due 2027-10-24. Signpost: A dated release or repository announcement appears, or Moonshot explicitly changes the November 4, 2026 target. Source: [Kimi K3.1 Pro’s token price is not its task price](https://newruntime.com/analysis/kimi-k3-1-pro-s-token-price-is-not-its-task-price/)
- **OpenRouter will document provider pinning, sticky sessions, or tool-version translation specifically for Claude requests that carry thinking blocks or computer-use tools.** - 40%, 12-month horizon, due 2027-10-24. Signpost: An OpenRouter docs or changelog entry naming Claude thinking-block or tool-version handling across providers. Source: [Haiku 5.5 is safe to fail over between providers for classification, not for its agents](https://newruntime.com/analysis/haiku-5-5-is-safe-to-fail-over-between-providers-for-classification-not-for-its/)
- **FOX reaches general availability with a Nemotron 3.5 Bolt model named among supported models.** - 25%, 12-month horizon, due 2027-10-25. Signpost: An NVIDIA GA announcement or FOX documentation page that lists Bolt by name. Source: [The "4GB" in Nemotron 3.5 Bolt E4B is a memory target, not what you will download or run](https://newruntime.com/analysis/the-4gb-in-nemotron-3-5-bolt-e4b-is-a-memory-target-not-what-you-will-download/)
- **At least one major coding-agent provider will publish guidance requiring monitoring or audit controls to sit outside the agent’s write permissions.** - 50%, 12-month horizon, due 2027-10-25. Signpost: Provider documentation or an enterprise deployment checklist specifies independent alerting or agent-inaccessible audit controls. Source: [Agent oversight needs a human escalation path outside the agent’s reach](https://newruntime.com/analysis/agent-oversight-needs-a-human-escalation-path-outside-the-agent-s-reach/)
- **Another AI developer tool, gateway or agent platform will disclose a breach exposing customer-stored LLM provider keys.** - 60%, 12-month horizon, due 2027-10-25. Signpost: A public incident notice telling users to rotate OpenAI, Anthropic or Google keys stored in a third-party product. Source: [Hiding provider keys behind a gateway only moves the pile; short-lived, scoped keys are what limit a breach](https://newruntime.com/analysis/hiding-provider-keys-behind-a-gateway-only-moves-the-pile-short-lived-scoped/)
- **Anthropic or Google adds a clause to its terms that explicitly requires approval or registration for third-party model routers or gateways. Rationale for 0.25: the distillation concern is shared across labs, but rivals may prefer to win over gateway traffic rather than gate it, so copying the clause is far from certain.** - 25%, 12-month horizon, due 2027-10-25. Signpost: Updated commercial terms or usage policies from either company that name routers, gateways or intermediaries. Source: [OpenAI's approval rule for gateways makes the model router the riskiest part of your stack, so keep your ability to switch models in MCP and skills](https://newruntime.com/analysis/openai-s-approval-rule-for-gateways-makes-the-model-router-the-riskiest-part-of/)
- **An independent third party publishes accuracy comparisons for Nemotron 3.5 Lightning across precisions (BF16 vs NVFP4 or a Hopper-compatible 4-bit build) showing a measurable drop on at least one long-context or coding task.** - 50%, 12-month horizon, due 2027-10-26. Signpost: A non-NVIDIA eval post or leaderboard listing two or more Lightning precisions side by side. Source: [Nemotron 3.5 Lightning's BF16 weights are the teacher, and the Blackwell-only NVFP4 build is the product](https://newruntime.com/analysis/nemotron-3-5-lightning-s-bf16-weights-are-the-teacher-and-the-blackwell-only/)
- **BFL's hosted LoRA support expands beyond Klein Base to at least one other hosted FLUX model.** - 40%, 12-month horizon, due 2027-10-26. Signpost: Release notes naming a non-Klein model as a supported LoRA fine-tuning target. Source: [BFL's hosted price is about a cent per image; licence terms and LoRA export will decide the economics](https://newruntime.com/analysis/bfl-s-hosted-price-is-about-a-cent-per-image-licence-terms-and-lora-export-will/)
- **StepFun releases a non-preview Step 5 checkpoint under the StepFun Model License family rather than Apache 2.0 or MIT.** - 50%, 12-month horizon, due 2027-10-26. Signpost: A Hugging Face repo for Step 5 without the 'Preview' label, with its LICENSE file. Source: [Step 5 Preview plugs into Claude Code, but nothing published yet shows it is a drop-in swap](https://newruntime.com/analysis/step-5-preview-plugs-into-claude-code-but-nothing-published-yet-shows-it-is-a/)
- **Perplexity publishes guidance or tooling on calibration differences between local pplx-decider-flash and hosted pplx-decider, such as threshold mapping or a parity evaluation.** - 30%, 12-month horizon, due 2027-10-26. Signpost: A docs page or changelog that addresses differences in local versus hosted probabilities, not only URL and auth changes. Source: [Decision APIs are repeating the chat-completions playbook, and once again the request shape will port while the probabilities will not](https://newruntime.com/analysis/decision-apis-are-repeating-the-chat-completions-playbook-and-once-again-the/)
- **Judgmental estimate: within 12 months, at least two of the next six New Runtime items on agent interfaces will describe typed or schema-governed outputs as a workflow component; otherwise this prediction fails.** - 55%, 12-month horizon, due 2027-10-26. Signpost: Count the next six interface/workflow items and check whether they specify schemas or typed decisions. Source: [Agent work scales by narrowing where effort goes](https://newruntime.com/analysis/metadox-agent-work-scales-by-narrowing-where-effort-goes/)
- **A public preprint or benchmark citing arXiv 2610.30571 will report instruction-vs-code conflict rates on real (non-constructed) repositories or on a language other than Python. Reasoning: the setup is cheap to replicate and the topic is active, but twelve months is a short window for follow-up papers.** - 40%, 12-month horizon, due 2027-10-26. Signpost: An arXiv listing or GitHub benchmark repository that cites 2610.30571 and reports results on non-constructed repos or a non-Python language. Source: [Coding agents can spot a stale AGENTS.md and still obey it, so make them report the conflict instead of choosing silently](https://newruntime.com/analysis/coding-agents-can-spot-a-stale-agents-md-and-still-obey-it-so-make-them-report/)
- **Public evidence of comparative operating performance will remain insufficient to judge whether Warp beats existing chemistry providers.** - 60%, 12-month horizon, due 2027-10-26. Signpost: Updates do not report comparable synthesis capacity, compound quality, turnaround, or cost against a stated alternative. Source: [Warp’s real test is whether a US chemistry CRO can beat the status quo](https://newruntime.com/analysis/warp-s-real-test-is-whether-a-us-chemistry-cro-can-beat-the-status-quo/)
- **Replit will describe deployment or data-control options for the planned enterprise context layer.** - 55%, 12-month horizon, due 2027-10-26. Signpost: Documentation or a product announcement specifies where the context data runs and how enterprise customers control access. Source: [Replit has bought context infrastructure, not yet an enterprise memory product](https://newruntime.com/analysis/replit-has-bought-context-infrastructure-not-yet-an-enterprise-memory-product/)
- **Public exposure estimates will be cited alongside stronger caveats about telemetry pools and version visibility, rather than as counts of compromised systems.** - 60%, 12-month horizon, due 2027-10-27. Signpost: A subsequent security report explicitly separates potentially exposed assets, measurable affected versions, confirmed exploitation, and confirmed compromises. Source: [PHP2Shell’s headline numbers show exposure, not a universal exploit](https://newruntime.com/analysis/php2shell-s-headline-numbers-show-exposure-not-a-universal-exploit/)
- **Public reporting on at least one neocloud will cite utilization, customer commitments, or refinancing as a material factor in its financing or expansion plans.** - 55%, 12-month horizon, due 2027-10-27. Signpost: A company disclosure or credible report connects a financing, restructuring, or capacity decision to utilization, customer demand, or refinancing. Source: [Callable GPU financing shifts the risk toward utilization](https://newruntime.com/analysis/callable-gpu-financing-shifts-the-risk-toward-utilization/)
- **Cursor announces a firm end date for legacy Pro/Ultra/Pro+ plans.** - 40%, 12-month horizon, due 2027-10-27. Signpost: The advance-notice email or forum post Cursor promised, giving a date after which legacy plans stop renewing. Source: [If you use Claude or GPT in Cursor, do the X Subscription math before you take a switch you can't undo](https://newruntime.com/analysis/if-you-use-claude-or-gpt-in-cursor-do-the-x-subscription-math-before-you-take-a/)
- **Anthropic publishes explicit terms, pricing or eligibility rules for third-party platforms that offer Mythos-class cyber scanning to their customers. The probability is lower because labs rarely publish reseller terms.** - 30%, 12-month horizon, due 2027-10-27. Signpost: An Anthropic policy, pricing or partner page addressing Mythos access through partner platforms, or a statement narrowing or expanding such access. Source: [Cognition's security launch looks like a bid to own the enterprise security relationship, using Anthropic's model as the draw](https://newruntime.com/analysis/cognition-s-security-launch-looks-like-a-bid-to-own-the-enterprise-security/)
- **Entire, GitHub or Cursor publishes false-positive or false-negative rates for an AI code-review agent used as a merge gate. Rationale: buyers will ask for it once gates can block merges, but publishing error rates is risky for a vendor, so it is likely to come slowly.** - 35%, 12-month horizon, due 2027-10-27. Signpost: A docs page or blog post giving measured accuracy for a named reviewer agent on a disclosed dataset. Source: [Agent merge gates are probabilistic, so the job that matters is measuring how often they are wrong](https://newruntime.com/analysis/agent-merge-gates-are-probabilistic-so-the-job-that-matters-is-measuring-how/)
- **OpenAI announces a shutdown date for GPT-5.6 Terra in the API.** - 50%, 12-month horizon, due 2027-10-27. Signpost: GPT-5.6 Terra appearing on OpenAI's API deprecations page with a shutdown date. Source: [GPT-6.1 Terra is switched on in Copilot unless an admin opted out, so your model policy matters more than its price](https://newruntime.com/analysis/gpt-6-1-terra-is-switched-on-in-copilot-unless-an-admin-opted-out-so-your-model/)

## Resolved

No resolved forecasts yet.
